University of Utah to Expand Applied Sciences Building

The University of Utah in Salt Lake City, Utah, is set to begin construction on renovations and additions to its applied sciences building. Work will start in early October and consist of renovating 40,000 square feet inside the William Stewart Building for Applied Sciences, as well as building a 100,000-square-foot addition on the building’s west side.

The building will play home to the Departments of Physics & Astronomy and Atmospheric Sciences, according to a news release, uniting students and faculty of aerospace, biotechnology, semiconductor technology, data science, air quality, and hazardous weather forecasting under one roof.

A news release reports that the new facility will offer a 56-percent increase in space for experimental and computer labs. The project comes with a price tag of about $84.6 million; of that, $60 million has been requested from the state, and the remainder will come from private funding. The university has already received donor commitments totaling $11 million.

One major impetus of the historic building’s renovation is the rising cost of maintenance issues, according to the university website. “[Maintenance] costs will only escalate and still barely stay ahead of their failing systems. The current state of these aging facilities and failing infrastructure places them in immediate crisis,” according to a 2018 Feasibility Study.

The university is partnering with DFCM Construction on the building’s construction. The new facility is scheduled to open its doors to students in August 2024.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Porter Family Center

    Porter Family Center for Innovation and Academics

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Porter Family Center for Innovation and Academics has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • California Middle School Breaks Ground on Major Renovation Project

    The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.