Grand Valley State University Adds Esports Center

Grand Valley State University in Allendale, Mich., recently debuted the newest addition to its campus, the Laker Esports Center. The center features Extron technology and features 25 gaming stations, a coaching station, and two wall-mounted displays, according to a news release. The stations are arranged in pods allowing individual or team play, and multiple pods can participate in group play at the same time.

An AV switching system allows coaches and spectators to watch and hear the game itself, as well as player communication via headphones with integrated microphones. Two 75” displays—one in the center of the room and one in the adjoining dining hall—can show any combination of gameplay, player stats, commentary, or background data, the news release reports.

“After attending Extron webinars and studying their Esports Design Guide and other reference materials, I felt confident that we could design our esports center in house,” said John F. Klein, GVSU’s Associate Director and Program Manager of Information Technology. “With a little help from Extron engineers, we did.”

The news release reports that the school’s IT team designed the system with “an Extron DTP CrossPoint 4K seamless presentation matrix switcher, a ShareLink Pro wireless collaboration gateway, an SMP 351 streaming media processor, and pendent speakers.” The main display uses an MGP 641 multi-window processor to allow up to four windows at a time. DTP HD 330 distribution amplifiers send video signals to displays in the dining hall, while TouchLink Pro panels allow control from various points in the Center.

“We standardized on Extron because they’re built well, have the features we want, and they last,” said Klein.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

  • California High School Debuts $35M Performing Arts Center

    Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • Washington University School of Medicine Completes $165M Expansion Project

    The Washington University School of Medicine in St. Louis, Mo., recently completed a vertical expansion of its Steven & Susan Lipstein BJC Institute of Health (BJCIH), according to a news release. The university partnered with Lawrence Group for the design of the six-floor addition, which cost about $165 million.

Digital Edition