Nonprofit Releases Renderings for New Uvalde Elementary School

Local news reports that the nonprofit organization planning a new elementary school for Uvalde, Texas, recently released renderings of the new facility. Robb Elementary School, the site of the school shooting that left 19 students and two teachers dead in May 2022, is scheduled for demolition, according to local leaders. The replacement facility is scheduled for completion in 2024 and will have a capacity of 800 students, according to KENS. The new facility will measure in at about 120,000 square feet, about twice the size of the existing campus.

“We haven’t had a new school in Uvalde since 1985,” said Uvalde Precinct 4 Judge Lalo Diaz. “So whatever we are going to give them is state-of-the-art.” Local news reports that Diaz is the co-chair of a committee comprised of educators, parents, and first responders who are collaborating with architects on the new school. Diaz also served as the coroner on the day of the mass shooting.

The new school’s design places a heavy emphasis on security. The executive director of the Uvalde CISD Moving Forward Foundation, Tim Miller, described security features and additions upon the design’s release. They include fencing around outdoor play areas, keyless entry, 9-foot privacy gates, a secure area for visitors near the building’s entrance, and a new road to provide first responders with quicker access to the school.

Other features include an air-conditioned gymnasium, two playgrounds, and an outdoor courtyard.

“We have had conversations about bullet-resistant film, especially on the windows that serve as the perimeter,” said Natalie Arias, co-chair on the advisory committee and the academic dean at Uvalde High School.

Diaz also revealed that the new school would pay tribute to the 21 victims of the shooting at Robb Elementary, although the specifics of the design are still in development. Local news reports that a separate committee will soon meet to come up with the new school’s name, and the foundation will host another meeting with completed schematics on March 20.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Agualta STEAM Engine

    Outdoor Learning Spaces and Biophilic Design Create Community in East Los Angeles

    Griffith STEAM Magnet Middle School's Agualta STEAM Engine blends education, community, and nature through its adaptable design.

  • Key Considerations for Office-to-Higher-Education Facility Conversions

    Since the onset of the COVID-19 pandemic, office-to-alternative-use conversions have become a recurring subject of urban development discourse. Office utilization rates across major U.S. cities remain below 50%, with vacancy rates exceeding 27% in San Francisco and 16% in New York. Higher education facilities present programmatic and spatial use cases that align readily with the typical characteristics of commercial office buildings.

  • Singlewire Software Report Reveals Gaps in K–12 School Entrance Security

    Single Software recently released its first-ever School Entrance Security Report based on more than 500 responses from U.S. school staff members. According to a news release, the findings highlight a gap between K–12 leaders’ wishes for school safety and how safe the schools actually are, as well as the challenges facing students and staff in that goal.

Digital Edition