Howard University Launches $785M Campus Master Plan

Howard University in Washington, D.C., recently held a groundbreaking ceremony for significant renovations to the 109-year-old Myrtilla Miner Building, according to a news release. The renovations mark the first step in a $785-million campus master plan that includes the construction of three new academic buildings and renovations to others by 2026.

After the restoration is complete, the Miner Building will become a shared space for interdisciplinary education between the Howard University School of Education and the Howard University Middle School of Mathematics and Science, the news release reports. The Miner Building was originally built between 1913–14 and has a place on the National Register of Historic Places for both its historical and architectural significance. The press release reports that the three-story building has gone almost unused for decades because of its need for renovations.

“This really is a full-circle moment in Howard’s history,” said Howard University President Wayne A. I. Frederick, M.D., MBA. “As we embark on this venture to create a space that meets the needs of the 21st-century classroom, a space that connects educators and students at such critical moments in their subsequent learning journeys, we recognize the significance of being able to do that in a building that holds a legacy of educating some of the nation’s first Black teachers. Moreover, as we work to preserve that legacy, we also understand the importance of preserving the most beautiful and historic parts of the physical space, through the halls of which countless changemakers have crossed.”

The renovation work will preserve the building’s hallmark architectural features including two-story arched windows, limestone baseboards along the corridors, and two grand staircases. Most of the work will be improving the building’s interior.

“The restoration of the Miner building represents an exciting step in our journey to revitalize Howard University’s campus,” said Senior Vice President and Chief Strategy Officer Rashad Young. “We have a fantastic team of dedicated builders, architects, and project managers led by our Real Estate Development and Capital Asset Management (REDCAM) division that will ensure this project does justice to the incredible history of this building, and that it is set up to provide the School of Education and Middle School a top-tier educational experience.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Aims Community College to Build Workforce Innovation Center

    Aims Community College in Greeley, Colo., recently announced that it has broken ground on its new Aims Workforce Innovation Center (AWIC), according to a news release. The facility for workforce development, entrepreneurship, and education has a scheduled opening date of fall 2026.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

Digital Edition