Francis Tuttle Technology Center: Danforth Campus


Images courtesy of Justin Miers Photography

The Francis Tuttle Technology Center, one of the premier career training schools in Oklahoma, enlisted architecture and design firm Bockus Payne in the creation of the Francis Tuttle Danforth Campus in Edmond, Okla. As outlying communities continue to grow, the demand for access to affordable education and training follows. Francis Tuttle’s desire to continue its reach and expand class offerings resulted in the need for a new campus. The 155,000-square-foot academic building consists of two stories dedicated to core classes and student support areas that articulate a proud industrial yet refined environment in support of the innovative solutions necessary to inform 21st-century students.

Bockus Payne designed a building that not only supports the needs of the diverse student population but also those of the local community. Classes in Entrepreneurship, Engineering, Biosciences and Medicine, Computer Science, Pre-Nursing, Cosmetology, Automotive Service Technology, and Interactive Media serve a wide range of student interests. Additionally, the building houses a business incubator as well as seminar and training spaces for conferences, continuing education, and corporate training. The program is carefully designed to ensure each curriculum type has its own identity and spatial requirements, while melding cohesively under one roof.

The building itself is identifiable with the goal of attracting, retaining, and educating future leaders. At first glance, the split-level building is set back from the main road, nestled into a site that drops 55 feet from the northwest corner to the southwest corner.  This helps to minimize the impact of the height of the building on the adjacent residential neighborhoods surrounding the site.  The exterior materials are honest in nature—a mixture of wood, concrete, and stone that flow naturally into the interior of the building. Simple, Oklahoma-centered landscaping was carefully selected to complement the building design.

Students and visitors enter through the building under a glass canopy. A multi-angled wall, bordering an open lobby, offers new students and visitors a glance into Francis Tuttle’s history. Clerestory windows lead into the main circulation hub, a pool of activity and flow that provides energy at its core. A glass railed bridge, overlooking the light-filled rotunda, offers views of the front landscape and ponds. The rotunda mimics a restful zone with space to work, connect, and enjoy an abundance of natural light. It also encourages instructors to break out of their classroom on elective days, making use of the grand stair for student seating—a unique option for energized learning. Corridors are designed to ensure the glass exterior walls filter light into the classrooms and labs. The corridors feature semi-open drywall ceilings with linear LED lighting that turns up to accent the edge of the ceiling.

Francis Tuttle sought to create a facility that encourages and facilitates the Design Thinking process, an approach that centers on the principles of empathy, expansive thinking, and experimentation. To do this, Francis Tuttle envisioned learning spaces like campfires (for open learning and collaboration), watering holes (that encourages reorientation between students learning from each other), and caves (to isolate and challenge oneself). To accomplish this, the design is highly flexible. Classrooms offer several furniture group selections and layouts to foster small group collaboration and individual learning. Glass entries at all classrooms and labs reveal the activities inside, making spaces come alive. Classrooms are open to corresponding labs so educational concepts can be quickly demonstrated. Two Design Thinking Studios enable students to explore concepts and work on projects. Nooks in the corridor provide space for small group discussion.

Francis Tuttle’s modern, clean interior is inviting and durable, with exposed natural elements that inspire creative and inquisitive minds. The exploration of full-spectrum color and a variety of energized shapes and angles invite the user to manipulate their environment by moving the furniture and writing on the walls—engagement to the fullest. Bockus Payne’s design embodies the school’s goals and supports the development of a thriving incoming workforce.

Featured

  • Kimball International Launches Season 5 of Alternative Design Podcast

    Commercial furnishings manufacturer Kimball International recently premiered the fifth season of its Alternative Design podcast, according to a news release. The first episode was released on March 17, and new episodes will launch monthly. The podcast discusses forces that shape built environments, from work to housing to healthcare to human wellness.

  • VLK Architects Receives Caudill Award for Texas Learning Center

    VLK Architects recently received the Caudill Award for its work on the Dr. Jim F. Chadwell Administration Building and Discovery Lab Learning Center for Eagle Mountain-Saginaw ISD in Fort Worth, Texas, according to a news release. The award is the highest honor from the Texas Association of School Administrators (TASA) / Texas Association of School Boards (TASB) Exhibit of School Architecture yearly competition.

  • Tennant Company Launches Autonomous Floor Scrubber

    Cleaning equipment and solutions provider Tennant Company recently launched the new X6 ROVR, a mid-sized robotic scrubber designed for large commercial and light-industrial environments, according to a news release. The autonomous machine can clean up to 75,000 square feet peer cycle with minimal needs for manual assistance.

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.