Northwestern State University Breaks Ground on New Academic Building

Northwestern State University in Natchitoches, La., recently celebrated a groundbreaking ceremony for a new academic building named after a former university president. Alost Hall will measure in at 73,200 square feet and feature multipurpose classrooms for a wide variety of academic disciplines, according to a university news release. The total cost of the project is $44 million.

“It is incredibly significant for everybody, and for students that are not even on campus yet, students who are not even born yet. They are going to benefit from this investment, so in a very real way, this groundbreaking is a testament to the work that we have all done collectively to invest again in higher education,” said Louisiana Gov. Jon Bel Edwards at the ceremony. “Education is the engine for economic growth and diversification. It is the key to opportunity and prosperity for everybody.”

Amenities in the new facility will include simulation laboratories for nursing and anesthesia programs; a clinic and training area for social work and psychology students; twelve 30-person classrooms; two 40-person classrooms; three 50-person classrooms; and space for 60 offices and an administrative office area, as well as a large conference room and reception area.

“Today, we gather to celebrate the start of a new chapter in the lift of our institution as we begin construction of the state-of-the-art building that will serve as the hub of innovation, collaboration, and learning for generations of students, faculty, and staff to come,” said NSU President Dr. Marcus Jones. “This groundbreaking is a testament to the unwavering commitment of excellence in education, research, and service to our community.”

Local news reports that the new facility will replace John S. Kyser Hall, the largest building on campus, which was built in 1968.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Greenheck Launches Optics Sensors for Kitchen Hoods

    Greenheck recently announced the launch of factory-installed optics sensors as an enhanced option for its kitchen ventilation hoods, according to a news release.

  • Creating a First and Lasting Impression with Thoughtful, Sustainable Design

    Clemson University’s Nieri Family Alumni and Visitors Center serves as the new front door to campus, anchoring the Tiger experience through each step in the student journey.

  • University of Kentucky Stormwater Harvesting System Receives Award

    The Utilities and Energy Management team from the University of Kentucky recently received a Grand Award at the 2025 Engineering Excellence Awards, according to a university news release. The award from the American Council of Engineering Companies of Kentucky was for the university’s Central Utility Plant (CUP) Stormwater Harvesting System, which activated in fall 2023.

Digital Edition