Uvalde School District Approves Plans for New Elementary School

The school board for the Uvalde Consolidated Independent School District in Uvalde, Texas, recently approved the design of a new elementary school to replace Robb Elementary, according to local news. The new facility will have a capacity for 800 students—almost twice that of the original school—and will prominently feature a memorial to the victims of last year’s shooting. The Uvalde CISD Moving Forward Foundation will now begin creating construction documents for the new school, which is scheduled to break ground in middle or late summer, according to local news.

A tree near the school’s entrance will serve as a reminder of the massacre at Robb Elementary School in May 2022. “It’s going to have two large limbs representing the two teachers and 19 smaller limbs representing the children,” said Uvalde Precinct 4 Judge Lalo Diaz. “Technically, this is going to be the center focus of the school and the vision of what we’re doing. Technically, this is holding up our school. This tree is going to be symbolizing the school for years to come.”

New safety measures will include fenced-in playgrounds and fields, keyless entry points, nine-for privacy gates, and a secure waiting area for visitors. A new road will also provide easy access to first responders during emergencies.

Funding for the $60-million project is coming largely through donations and fundraising, according to local news. The foundation has raised almost 70% of the goal and is accepting donations online.

“The Uvalde CISD Moving Forward Foundation is honored to begin the next phase of our work to build a new elementary school in the Uvalde Consolidated Independent School District,” said Tim Miller, the foundation’s executive director. “With this evening’s approval of the schematic design by the UCISD school board, we now move to the initial phases of the construction phase through the creation of construction documents.”

The new school will measure in at two stories and 120,000 square feet, according to local news. It’s scheduled to open its doors in time for the 2025–26 academic year.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • PNSI Global Alliance Launches New Quality Assurance Certification

    PNSI Global Alliance, a network of technology integrators and service providers, recently introduced a new Quality Assurance Certification (QAC) for AV service and support, according to a press release. The two-day, interactive workshop QAC course is designed for Certified Solution Providers (CSPs) to provide them with the most up-to-date and advanced quality assurance knowledge available.

  • Active Learning Classroom

    Striking a Balance: The Keys to Renovating Science Education Buildings for the 21st Century

    The recent renovation of the Durham Science Center at the University of Nebraska-Omaha (UNO) provides a roadmap for facilities managers tasked with balancing budget constraints, modern pedagogical demands, and long-term sustainability.

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

Digital Edition