DFW-Area K–12 District Breaks Ground on New STEAM Academy

Last week, the Waxahachie Independent School District near Dallas, Texas, held a groundbreaking ceremony for a new STEAM school, according to a news release. The Wilemon STEAM Academy will have space for about 800 students in grades K–5 and was designed by VLK Architects. Funding for the project came from a bond that local voters passed in May 2023.

The campus will measure in at 102,000 square feet and feature amenities like an open-concept library; creation spaces featuring a wood engraver, LEGO station, and science and robotics labs; an outdoor courtyard; recording studio; flex spaces; a gymnasium; and a cafeteria. The release reports that the new school’s mission is to “create an innovative learning environment in which students thrive, using critical thinking, creativity, communication, and collaboration to solve real-world problems and promote career awareness.”

“The construction of a new home for the incredibly successful Wilemon STEAM Academy is an exciting step in the continued growth of Waxahachie ISD,” said Jonathan Aldis, VLK Architects Principal. “The new campus allows for even more students in Waxahachie to engage in an education focused on science, technology, engineering, arts, and math in an innovative and collaborative learning environment.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Photo courtesy of Kraus-Anderson

    Concordia College Completes Memorial Auditorium Renovations

    Concordia College in Moorhead, Minn., recently completed a $2.5-million renovation project to Memorial Auditorium, a news release reports. The college partnered with Kraus-Anderson for the project’s construction and ICON Architectural Group for its design.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.