Colburn School in Los Angeles Breaks Ground on Campus Expansion

The Colburn School in Los Angeles, Calif., recently held a groundbreaking ceremony for a 100,000-square-foot expansion designed by world-renowned architect Frank Gehry, according to a news release. The Colburn School is a music and dance education and performance institute that offers services to people of all ages, from 7-month-olds to adults. The school’s new building, the Colburn Center, will increase the school’s training and performance facilities and stand adjacent to the existing Grand Avenue campus.

“The Colburn Center will be a game changer, stepping up everything we do for the school’s own community, for our peer organizations that make the LA artistic ecosystem so vibrant, and for the public that we look forward to welcoming,” said Colburn School President and CEO Sel Kardan. “At Colburn, making performances accessible to LA audiences is as much a part of our core mission as making first-rate music and dance education available to everyone. These are the same values we see in the wonderful design by Frank Gehry: artistic excellence at the highest level, combined with a deep love for the dynamism and diversity that animate life in a great city.”

According to the news release, the Colburn Center will stand alongside the Walt Disney Concert Hall and The Grand complex—also designed by Gehry—to form the largest concentration of the architect’s work in the world.

Principal design features include a 1,000-seat theater performance space, four studios for dance classes and rehearsal, and other teaching and support facilities, according to a project fact sheet, as well as a natural-light-filled entrance and gardens at street and rooftop levels. All performance and rehearsal spaces were designed to accommodate a wide variety of potential configurations and productions.

“This is a long time coming, and I am so grateful for everyone who helped make it possible,” said Gehry. “For me, this building is very special. It adds significant opportunity for growth in music, music education, and collaboration inside of Colburn and with the other arts institutions in LA. I really believe it will unlock untold riches in the cultural community here in LA and I am honored to be a part of it.”

The Colburn School is partnering with McCarthy Building Companies for the project’s construction, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

  • Rush-Henrietta Central School District’s Sperry High School

    A New Perspective: Using Adaptive Reuse Concepts in K-12 Planning

    In the face of increasing pressures on construction timelines, budgets, and material availability, the renovation and reuse of pre-existing structures for new purposes can help bridge the gap between modern school programming and outdated school infrastructure.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

Digital Edition