Colburn School in Los Angeles Breaks Ground on Campus Expansion

The Colburn School in Los Angeles, Calif., recently held a groundbreaking ceremony for a 100,000-square-foot expansion designed by world-renowned architect Frank Gehry, according to a news release. The Colburn School is a music and dance education and performance institute that offers services to people of all ages, from 7-month-olds to adults. The school’s new building, the Colburn Center, will increase the school’s training and performance facilities and stand adjacent to the existing Grand Avenue campus.

“The Colburn Center will be a game changer, stepping up everything we do for the school’s own community, for our peer organizations that make the LA artistic ecosystem so vibrant, and for the public that we look forward to welcoming,” said Colburn School President and CEO Sel Kardan. “At Colburn, making performances accessible to LA audiences is as much a part of our core mission as making first-rate music and dance education available to everyone. These are the same values we see in the wonderful design by Frank Gehry: artistic excellence at the highest level, combined with a deep love for the dynamism and diversity that animate life in a great city.”

According to the news release, the Colburn Center will stand alongside the Walt Disney Concert Hall and The Grand complex—also designed by Gehry—to form the largest concentration of the architect’s work in the world.

Principal design features include a 1,000-seat theater performance space, four studios for dance classes and rehearsal, and other teaching and support facilities, according to a project fact sheet, as well as a natural-light-filled entrance and gardens at street and rooftop levels. All performance and rehearsal spaces were designed to accommodate a wide variety of potential configurations and productions.

“This is a long time coming, and I am so grateful for everyone who helped make it possible,” said Gehry. “For me, this building is very special. It adds significant opportunity for growth in music, music education, and collaboration inside of Colburn and with the other arts institutions in LA. I really believe it will unlock untold riches in the cultural community here in LA and I am honored to be a part of it.”

The Colburn School is partnering with McCarthy Building Companies for the project’s construction, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Designing Learning Spaces that Support Student Mental Health and Wellness

    In today’s education landscape, schools are more than just centers for learning; they are integral to the holistic development and well-being of students. The global pandemic underscored the importance of addressing mental health in schools, as productivity dropped, stress levels rose and students faced challenges managing emotions.

  • Embry-Riddle Breaks Ground on New Office Building

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced that construction has begun on a new office building for its campus Research Park, according to a news release. The university partnered with Hoar Construction on the 34,740-square-foot Center for Aerospace Technology II (CAT II), which will be used for research and lab purposes.

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

Digital Edition