University of Florida Gains Temporary Kitchen, Dining Structure

The University of Florida in Gainesville, Fla., recently deployed a 6,600-square-foot temporary kitchen and dining structure in one of its parking lots, according to a news release. The structure known as “The Eatery” will serve students until the completion of Broward Hall renovations in fall 2024. The university partnered with Mobile Kitchen Solutions, a division of Rental Solutions and Events, to install the facility during winter break 2023.

The facility will offer food, cooking, preparation, storage, serving, and dining services during the university dining hall renovation. The structure is climate-controlled and divided into two main areas—the dining and buffet area, and the kitchen. The dining area features class walls and decor, signage, buffet stations, and tables and chairs. The full-service kitchen includes smaller sections dedicated to prep and storage, dishwashing, and sinks featuring dry storage racks. RSE also installed a 40-foot containerized temporary kitchen POD to offer gas cooking equipment including double-stack ovens, steamers, and tilt skillets. The unit offers safety procedures like fire suppression systems and exhaust/make-up air hoods to meet code, the news release reports. Lastly, it includes two upscale restroom trailers and one ADA-compliant restroom trailer.

The university moved into the temporary dining facility on Jan. 1. MKS also provided all temporary cabling, distribution boxes, interior plumbing, and HVAC systems.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition