Florida Net-Zero High School Completes $29M Expansion Project

NeoCity Academy in Kissimmee, Fla., recently completed a 53,000-square-foot, three-story addition to its campus, according to a news release. The school partnered with construction firm Skanska on the project, which includes 26 new classrooms with collaborative learning spaces and labs. NeoCity Academy was the first net-zero high school campus in the state of Florida, the news release reports.

The expansion includes sustainability features like a photovoltaic canopy that provides solar energy as well as shade and shelter, LED lighting, and designated space for future rooftop solar panels. The project also involved detailing and expanding the school’s building envelope to reduce air leakage and control temperature, air, and humidity. Window placement and sizing were also taken into account to minimize the school’s energy use and heat gain.

“We’re excited to deliver this sustainability-focused expansion to NeoCity Academy and the School District of Osceola County,” said Skanska Vice President Daniel Abou-Jaoude. “This project is a testament to Skanska’s commitment to construct innovative and forward-thinking educational facilities throughout the state.”

The project also features a photovoltaic “mixer” space that acts as a gathering space for faculty and students. Other site improvements include a new canopy and covered walkway that create both outdoor learning spaces and increased accessibility between buildings, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • golden trophies with falling confetti

    Spaces4Learning Launches 2026 New Product Awards

    Spaces4Learning is happy to announce that we’re now accepting entries for the 2026 New Product Awards! The awards program recognizes the outstanding product development achievements of manufacturers and suppliers whose products or services are considered particularly noteworthy.