DIGroup Architecture Completes First NYC-Area School

DIGroup Architecture recently announced the completion of its first education project in New York City, according to a news release. P.S. 748, The Albee Square Campus, will take up six floors of a new 34-story office tower in Brooklyn, N.Y., and is part of a larger city plan to add the capacity for 45,000 new students as part of the New York City School Construction Authority’s 2020–24 Capital Plan. The facility is set to open its doors to students in September.

The PreK–5 school covers about 80,000 square feet and includes 14 total classrooms, two special education classrooms, gym, cafeteria and kitchen, assembly space, and dedicated entryway on the office tower’s ground floor. During construction, the space served as the temporary home for Design Works High School during the 2023–24 academic year.

“This project is a true reflection of the work we are committed to at DIG, and we are privileged to be a part of SCA’s investment in New York City Schools,” said Jeff Venezia, DIG’s chief executive officer. “The temporary use of the Albee Square Campus by Design Works High School also demonstrated the flexibility of the space, as well as the adaptability and commitment of NYC SCA to remain nimble in accommodating student needs.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.