DIGroup Architecture Completes First NYC-Area School

DIGroup Architecture recently announced the completion of its first education project in New York City, according to a news release. P.S. 748, The Albee Square Campus, will take up six floors of a new 34-story office tower in Brooklyn, N.Y., and is part of a larger city plan to add the capacity for 45,000 new students as part of the New York City School Construction Authority’s 2020–24 Capital Plan. The facility is set to open its doors to students in September.

The PreK–5 school covers about 80,000 square feet and includes 14 total classrooms, two special education classrooms, gym, cafeteria and kitchen, assembly space, and dedicated entryway on the office tower’s ground floor. During construction, the space served as the temporary home for Design Works High School during the 2023–24 academic year.

“This project is a true reflection of the work we are committed to at DIG, and we are privileged to be a part of SCA’s investment in New York City Schools,” said Jeff Venezia, DIG’s chief executive officer. “The temporary use of the Albee Square Campus by Design Works High School also demonstrated the flexibility of the space, as well as the adaptability and commitment of NYC SCA to remain nimble in accommodating student needs.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition