New Jersey K–12 District, PureTek Partner to Create Three New Education Spaces

Audiovisual solutions company PureTek Group recently partnered with Plainfield Public Schools in Plainfield, N.J., to create three new educational spaces for the district, according to a news release. The project involves upgrading the existing Plainfield High School auditorium into a performing arts center, a mini-theater into a blackbox theater, and two adjacent unused classrooms into an Esports Arena. The renovations will create new STEAM and CTE learning opportunities across the district.

The Esports Arena contains 20 gaming stations for players, as well as additional stations for broadcast operators, shoutcasters, and a replay operator. Spectators can watch from the school’s auditorium, and the blackbox theater also serves as a greenroom for teams not currently playing. Technology highlights include immersive lighting via criss-crossing, ceiling-mounted strips; integration with the performing arts center and blackbox theater; and broadcasting capabilities.

The Performing Arts Center (PAC) has a capacity for 1,600 and will play home to student performances. In addition to Esports Tournaments, it will also be used for rentals and community support programs. Technology highlights include the unRAVL Controls, which offer streamlined and intuitive control for rigging, AV, and lighting systems from a single touch panel. The PAC also has a large projection screen with a 30,000-lumen 4K laser projector, according to a project fact sheet.

The Blackbox Theater has a 120-seat capacity and will be used for arts education and performance spaces. It can also serve as the esports green room, as a professional education space, and a college-style lecture hall to prepare older students for university settings. The Blackbox Theater also uses the unRAVL System for rigging, audio, visual, and lighting solutions, the fact sheet reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

  • Midland ISD Starts Construction on Two New High Schools

    The Midland Independent School District recently announced that it will break ground on two new high schools in Midland, Texas, according to a news release. The district is partnering with Pfluger Architects, Lee Lewis Construction, and Satterfield & Pontikes to create a total of over 1.5 million square feet for 8,400 students in grades 9–12.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

Digital Edition