New Eagle Mountain High School Designed to Utilize Natural Features

Eagle Mountain High School

Eagle Mountain-Saginaw Independent School District's newly built Eagle Mountain High School has opened its doors to students for the first day of school. The facility, designed by VLK Architects and made possible by a voter-approved bond proposal passed in 2017, marks the Texas district's fourth comprehensive high school, with capacity for 2,400 students.

A key component of the architectural design was the determination to take advantage of the location's natural features, according to a news announcement. The site's hilly terrain, including a once-dry pond and dry creek bed, was retained and incorporated into the campus design. For example, the pond was filled with 37 million gallons of water for landscape irrigation, and an enclosed bridge was built over the dry creek bed, to allow students to cross between the school's academic wing, dining areas, fine arts spaces, and athletics facilities safely. In addition, the campus utilizes a geothermal mechanical system for energy savings and lower maintenance costs.

Specially designed learning spaces include classrooms for robotics, floral design, agriculture, and STEM labs; facilities for band, choir, art, dance, and theater programs; and athletic areas including a stadium, fieldhouse with an indoor practice facility and weightroom, and spaces dedicated to baseball, softball, gymnastics, cheer, soccer, and tennis.
  
"The process and thoughtfulness Eagle Mountain-Saginaw ISD places into district facilities reflects their stewardship of the entire community," said Lauren Brown, VLK principal-in-charge, in a statement. "Eagle Mountain High School's design supports the district's instructional needs, commitment to energy-efficient system design, and the implementation of cohesive, student-focused learning environments inside and outside. As EMHS develops their traditions and culture, the outcomes will be generational and will be for the greater good of the community that supported the vision and success of the young learners."

About the Author

Rhea Kelly is editor in chief for Campus Technology, THE Journal, and Spaces4Learning. She can be reached at [email protected].

Featured

  • Elevating Campus Maintenance: How Power Wash Drones are Transforming Educational Facilities

    As today’s campuses grow larger and more architecturally complex, keeping exteriors clean, safe, and inviting has never been tougher. Facilities leaders are under constant pressure to stretch budgets, meet safety standards, and support sustainability goals—all while tackling the stubborn challenge of exterior cleaning.

  • Empowering People Through Smart, Sustainable Campuses

    Sustainability is facing increasing scrutiny, with some questioning its costs and priorities. Yet for universities, it remains an essential driver of resilience, operational efficiency and long-term competitiveness. At the same time, there is a growing recognition that sustainable transformation is not just about reducing energy consumption and emissions to comply with tightening regulations ‒ it’s about creating vibrant, comfortable environments where people can thrive, innovate and connect. For university leadership, this is a complex balancing act, with rising energy costs and limited budgets only adding to the challenge.

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

Digital Edition