New Eagle Mountain High School Designed to Utilize Natural Features

Eagle Mountain High School

Eagle Mountain-Saginaw Independent School District's newly built Eagle Mountain High School has opened its doors to students for the first day of school. The facility, designed by VLK Architects and made possible by a voter-approved bond proposal passed in 2017, marks the Texas district's fourth comprehensive high school, with capacity for 2,400 students.

A key component of the architectural design was the determination to take advantage of the location's natural features, according to a news announcement. The site's hilly terrain, including a once-dry pond and dry creek bed, was retained and incorporated into the campus design. For example, the pond was filled with 37 million gallons of water for landscape irrigation, and an enclosed bridge was built over the dry creek bed, to allow students to cross between the school's academic wing, dining areas, fine arts spaces, and athletics facilities safely. In addition, the campus utilizes a geothermal mechanical system for energy savings and lower maintenance costs.

Specially designed learning spaces include classrooms for robotics, floral design, agriculture, and STEM labs; facilities for band, choir, art, dance, and theater programs; and athletic areas including a stadium, fieldhouse with an indoor practice facility and weightroom, and spaces dedicated to baseball, softball, gymnastics, cheer, soccer, and tennis.
  
"The process and thoughtfulness Eagle Mountain-Saginaw ISD places into district facilities reflects their stewardship of the entire community," said Lauren Brown, VLK principal-in-charge, in a statement. "Eagle Mountain High School's design supports the district's instructional needs, commitment to energy-efficient system design, and the implementation of cohesive, student-focused learning environments inside and outside. As EMHS develops their traditions and culture, the outcomes will be generational and will be for the greater good of the community that supported the vision and success of the young learners."

About the Author

Rhea Kelly is editor in chief for Campus Technology, THE Journal, and Spaces4Learning. She can be reached at [email protected].

Featured

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • Miami University Approves New $242M Multipurpose Arena

    Miami University in Oxford, Ohio, recently announced that its Board of Trustees has approved construction of a new multipurpose arena at Cook Field, according to university news. The $242-million project will serve as a new centralized hub for student life and create space for economic development on campus.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.