Greenheck Launches Optics Sensors for Kitchen Hoods

Greenheck recently announced the launch of factory-installed optics sensors as an enhanced option for its kitchen ventilation hoods, according to a news release. The Model GKC kitchen ventilation controls now come standardized with hood-mounted temperature sensors, which can respond to and modulate changes in airflow up to five times faster than sensors mounted in ducts. Additionally, optics sensors can detect steam and smoke within seconds, triggering exhaust fans.

The sensors can be included in an optional variable volume system that can turn down the fan speed by up to 50 percent. Energy savings meet California Title 24, IECC 2024, and ASHRAE 90.1 energy standards, the news release reports.

The Model GKC features include a touchscreen display to control fans, lights, and make-up air. Touchscreens can now be added to each individual hood section for ease of light and fan control within individual zones. All Greenheck kitchen ventilation equipment features make-up air, exhaust hoods and fans, utility distribution systems, dedicated outdoor air systems (DOAS), fire suppression systems, and pollution control units, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • Miami University Approves New $242M Multipurpose Arena

    Miami University in Oxford, Ohio, recently announced that its Board of Trustees has approved construction of a new multipurpose arena at Cook Field, according to university news. The $242-million project will serve as a new centralized hub for student life and create space for economic development on campus.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.