AP Construction Breaks Ground on Two Projects for Austin ISD

Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027. The district also partnered with PBK Architects for design work on both schools.

McCallum High School will be expanded to include a new space for the Science and CTE department, a three-story building measuring 54,000 square feet. The space will include space for robotics, wood shop, biology, chemistry, physics, and computer labs. The school’s existing science wing will be demolished. Work also includes a new, secure vestibule and remodeling the front office.

“AP recognizes the incredible responsibility and honor of creating spaces where students can learn and flourish by delivering quality renovations that enhance the educational environment,” said AP Senior Director of Preconstruction Tommy Meserole. “Schools are the heart of the community, fostering growth and connection and we are dedicated to providing exceptional work to support these campuses.”

Meanwhile, Anderson High School will see a new 43,350-square-foot competition gym with the capacity for 1,800 spectators, locker rooms and coaches’ offices, training rooms, laundry, and officials’ dressing rooms. The school’s front office and entry vestibule will also be reconfigured for security, according to the news release.

“The new athletic facilities are more than just a place to play; they’re vital for developing teamwork, discipline and physical well-being,” said Brian Lancaster, Anderson High School Principal. “They provide a platform for students to build character, learn important life skills and foster a sense of community and school pride.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part I

    We asked, you answered, and the results are in! Last year, we put out a call for submissions to collect our readership’s opinion on trends and predictions for K–12 and higher education facilities in 2026.