Inglewood Unified School District Breaks Ground on New High School

The Inglewood Unified School District in Inglewood, Calif., recently broke ground on a new campus for Inglewood High School, according to a news release. The project has a budget of about $240 million, funding coming through bond proceeds from Measure I. According to the news release, the campus was designed to “foster critical thinking, creativity, and adaptability” and features amenities like collaborative classrooms, labs equipped with modern technology, and flexible learning environments.

The district partnered with Balfour Beatty as general contractor, Cordoba Corporation for construction management, and Practice for architectural design. The campus will measure in at more than 150,000 square feet including two new CTE buildings, arts and performance spaces, STEM labs, and athletic facilities, the news release reports.

“This is more than groundbreaking; this is a promise,” said IUSD County Administrator Dr. James Morris. “We are promising our students a future where innovation, access, and excellence intersect. This investment reflects our unwavering belief that every student in Inglewood deserves a world-class education in a world-class learning environment, one that prepares them to step confidently into their future.”

According to the district website, other site development work will include landscaping, exterior lighting, new outdoor basketball and tennis courts, a new artificial turf field, a solar array installation, and new parking & drop-off areas. The project has an estimated completion date of December 2027.

"Breaking ground on Inglewood High represents a pivotal moment for this community and marks another opportunity for our company to play a role in transforming educational environments across California," said Emily Kay, Balfour Beatty president in California. "As we begin construction on this state-of-the-art facility, we're excited to work with Inglewood Unified School District and our industry partners to bring our client’s vision to reality. This milestone exemplifies our dedication to delivering innovative learning spaces that will serve students and families for generations to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).