Avantis Education Revamps Hardware for ClassVR Solution

Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

Xcelerate is the first headset designed specifically for higher education and high environments, the news release reports. It offers head and controller tracking with six degrees of freedom, as well as a 90-degree flip visor to let students transition between the VR world and real-world collaborating. It also has a four-camera spatial tracking system for precision of movement in the digital space, as well as a boundary safety to help delineate classroom space.

“Everything about Xcelerate was designed with education in mind – like all of our ClassVR solutions,” said Avantis Education’s Chief Marketing Officer, Gillian Rhodes. “That means putting the student front and center with ergonomics and experience, and ensuring it’s a plug-and-play technology that teachers feel confident to deploy and manage in the classroom.”

Meanwhile, Xplorer was designed for K–12 spaces in response to user feedback. The new hardware can provide more sophisticated VR/AR experiences through a 4K Ultra-HD display, an upgraded LCD screen, and enhanced audio capabilities.

Both new headsets are powered by Snapdragon XR Platforms in partnership with Qualcomm Technologies, Inc., according to the news release.

“Our collaboration with Avantis Education is helping redefine what’s possible in immersive learning,” said Qualcomm’s Senior Director of Product Management, Sahil Bansal. “With our Snapdragon processors at the heart of Xcelerate and Xplorer, the new headsets power richer VR/AR content than ever before. Together, we are bringing Avantis’ most advanced solutions to market – helping to transform XR experiences and enhance learning for students worldwide.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.

  • Indiana Wesleyan University Schedules Grand Opening for New Welcome Center

    Indiana Wesleyan University recently announced that it will soon open a new Welcome Center on its campus in Marion, Ind., according to a news release. The facility will serve as the home base for prospective students and their families to learn more about the university and student life there. A ribbon-cutting ceremony is scheduled for February 19.

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.