Armstrong World Industries Acquires Geometrik

Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.  Geometrik was originally founded in 2007.

“We are excited to join forces with Armstrong to grow our position in Canada and the U.S.,” said Vladimir Bolshakov, Geometrik CEO and President. “With our shared focus on creativity and innovation, we look forward to bringing inspiring solutions to more customers.”

“We are excited to welcome Geometrik to the Armstrong family and to significantly expand our wood manufacturing capabilities and product portfolio in Canada and the U.S. with sought-after wood species like Western Hemlock,” said Vic Grizzle, Armstrong World Industries CEO and President. “We know designers and architects are drawn to the warmth of wood looks and biophilic design as demand for our products in this category has continued to grow.”

Geometrik’s portfolio includes wood ceiling and specialty wall solutions among a wide variety of wood types, stains, perforations, shapes, and sizes, the news release reports. It offers a total of nine acoustic ceiling and wall systems with a curated palette of a dozen standard and custom finishes.

"By combining the creative designs and manufacturing capabilities of Geometrik with Armstrong’s existing wood capabilities and best-in-class service platform, we expect to accelerate our growth in this rapidly expanding category and deliver more of these innovative, inspiring solutions to customers across North America,” said Grizzle.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Higher Ed is Betting on New Buildings While Quietly Undermining Their Campuses — Here’s Why

    In this climate, the owner’s representative has changed from a delivery-focused advisor to a strategic campus partner. Institutions are increasingly relying on owner’s reps not just to manage, cope, schedule, and budget, but also help evaluate whether a project should proceed at all.

  • Missouri Child Development Center Completes $2.3M Expansion

    The Urban Sprouts Child Development Center in St. Louis, Mo., recently announced the completion of a $2.3-million expansion and adaptive reuse project, according to a news release. The new space includes a retail café, outdoor learning space, and a support office building.