Hawaii Elementary School Breaks Ground on New Classroom Building

Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses. The district partnered with Urban Works, Inc., for the project’s design, the West Hawaii District Office for construction management services, and Nan Inc. for construction.

“This building has been a bridge, literally and figuratively, connecting the school, partners and our students’ education,” said Keith Hayashi, district superintendent. “From the support of Sen. Dru Kanuha and Rep. Nicole Lowen to the new DAGS district office and the designers who offered a solution that met school needs within site constraints, we are looking forward to this new building connecting the upper and lower campus and elevating the learning environments for students, teachers and staff.”

The facility will include four classrooms, an outdoor classroom, special education classrooms, a covered learning lanai, administrative space, and storage rooms, the news release reports. The new building will connect to existing buildings via two pedestrian bridges. Design features include neutral tones to blend with the natural landscape, as well as copper roofing, colored building outcroppings, and Hardie clapboard siding to give the school a lived-in, homey feel.

“We are grateful to the legislature and Governor Green for supporting the effort of creating a second district office on Hawaiʻi Island. Given the long travel times from Hilo to Kona, it was evident a second office was needed to properly service our schools and DAGS-managed facilities in West Hawaiʻi,” Keith Regan, comptroller and DAGS director, said. “It’s thanks to this support that we now have a highly skilled and motivated district engineer in place in West Hawaiʻi who has positively impacted our support of the DOE and our other operations.”

The building has an estimated completion date of Sept. 2027, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

Digital Edition