(Day) Lighting the net-zero energy classroom building

Solatube 

Solatube Daylighting Systems helped the Lenawee Intermediate School District to create a net-zero energy classroom building, completed in June 2013.

The Lenawee Intermediate School District (LISD) has installed numerous Solatube Daylighting Systems made by Solatube International, Inc., the worldwide leading manufacturer and marketer of Tubular Daylighting Devices (TDDs), in its groundbreaking Center for a Sustainable Future (CSF) in Adrian, Mich. The CSF features 21 Solatube 750DS-C units and five 750DS-O units, which were designed for school and commercial applications.

The Solatube Daylighting Systems were installed in the new 8,600-square-foot, state-of-the-art, net-zero energy classroom building, which was completed in June 2013 and targeting LEED Platinum certification. The facility is designed to produce as much energy as it uses, a first for a K-12 building in Michigan. The state-of-the-art educational campus embodies environmental sustainability and offers hands-on learning experiences in agri-science, biology, alternative energy, and strategies to reduce reliance on non-renewable resources. The team responsible for this innovative design was a combination of SHW Group, The Collaborative, Inc. and CMTA Engineers. Architectural Building Products, a Solatube Commercial Distributor for Michigan, provided the Solatube units.

“The use of Solatube Daylighting Systems is an integral part of our energy management system providing natural light which is very conducive to the learning environment,” says Jim Philp, Lenawee Intermediate School District superintendent. “Solatube products are a cost-efficient solution to provide lighting to classroom and office space. The district is currently looking into using Solatube Daylighting Systems in existing buildings, as well.”

Solatube Daylighting Systems are available through factory trained Solatube Commercial Distributors. For more information, please visit http://www.solatube.com/commercial.

solatube.com/commercial

This article originally appeared in the School Planning & Management October 2013 issue of Spaces4Learning.

Featured

  • Florida District Selects Designer for K–8 Prototype Campus

    St. Lucie Public Schools in St. Lucie, Fla., recently announced that it has selected Spiezle Architectural Group, Inc., to design its new Western Grove K–8 prototype campus, according to a news release. Construction on the 217,500-square-foot facility will begin in February 2025 and is scheduled for completion in August 2026.

  • Minnesota K–12 District Completes New Elementary School

    Rock Ridge Public Schools in Virginia, Minn., recently announced that construction of the district’s newest elementary school is complete. North Star Elementary cost $28.5 million and has the capacity for 600 students in grades 3–6, according to a news release.

  • college student sitting at a desk, studying on a glowing laptop with geometric shapes representing technology in the background

    Pearson Introduces New AI-Powered Study Tools

    Digital learning company Pearson has launched several new AI-powered tools to help provide students personalized help from within their e-textbooks or study platforms.

  • San Diego High School Hits Construction Milestone

    Part of a whole-site modernization project at Mira Mesa High School in San Diego, Calif., recently reached a construction milestone. The final steel beam of the new classroom and student services facility was put into place, completing the building’s structural framework.

Digital Edition