Lighting Controls Save Energy

Lighting Controls Save Energy 

With Lutron High Bay Athlite Fixtures, Moravian College was able cut previous electrical output by 83 percent in their recreational gym.

Moravian is a small, residential college in Bethlehem, PA, founded in 1742 — the sixth oldest college in the United States. It is a school steeped in the liberal arts tradition and deeply committed to its students. To strengthen the sense of campus community, the school had long planned to renovate its Athletic and Recreation Center. Construction involved updating its competition and recreational gyms, and adding a 10,000-squarefoot fitness center for faculty and students.

As part of the overall construction and renovation project, the college identified the need for an energy-efficient lighting retrofit that would allow centralized control and programming of the lighting in all the athletic facilities, and would also deliver significant lighting energy savings. Work had to be done quickly, during the summer break, in order to minimize disruption to the students and the athletic program.

In both gyms, Moravian replaced inefficient, high-intensity discharge (HID) lighting with Lutron High Bay Athlite fixtures and digital fluorescent dimming ballasts. The school also installed preset lighting controls, eliminating the guesswork previously used to create the right light level.

The energy savings — reported via Lutron GreenGlance energy reporting software — were staggering. Compared to the original HID lighting, the new system has already saved 83 percent of the electric output in the recreational gym and 71 percent in the competition gym.

“Our students appreciate the fact that the court is more evenly lit, and that the new lights are silent. The loud buzz from the old lights is completely gone. That means it’s better for the athletes,” notes Mary Beth Spirk, the head coach of the Women’s Basketball Team at Moravian.

www.lutron.com

This article originally appeared in the issue of .

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition