Modular Building of the Month Announced for July 2014

Modular Building Institute recognizes modular construction innovation in relocatable classroom construction in this project by Anderson Anderson Architecture in San Francisco, manufacturer Blazer Industries, Inc. of Aumsville, Oregon and Hawaii Modular Space of Kapolei, Hawaii.

Modular Building Institute is pleased to announce that the July 2014 Modular Building of the Month is Energy Positive Portable Classroom in Ewa Beach, Hawaii. This classroom was designed by Anderson Anderson Architecture in San Francisco, manufactured by Blazer Industries, Inc. of Aumsville, Oregon and installed by Hawaii Modular Space of Kapolei, Hawaii. This 1200 square foot classroom was constructed in 762 days and is easily relocatable, even to remote areas. Details on the project can be found here: Energy Positive Portable Classroom.

This revolutionary temporary classroom solution uses natural light and recycled insulation materials as well as an energy-efficient HVAC system to have minimum environmental impact and maximum contribution to a healthy indoor environment. The design focuses on performance issues directly impacting the learning experience of its occupants and the environmental quality of its community—thermal comfort, natural daylighting, indoor air quality, energy and resource conservation and generation.

The design optimizes photovoltaic roof surface orientation, naturally shaded north-facing daylight glazing and modulated natural ventilation which is then balanced with manufacturing and transport efficiency, functionality for classroom use, low operating costs and ease of maintenance. It provides excellent interior thermal, lighting, and acoustic performance based on current research in optimized learning environments, as well as electrical systems designed for contemporary and future digital teaching expectations.

The structure’s steel frame and steel/rigid foam sandwich panel floor and roof system are designed to minimize material use, maximize insulation and heat reflection, and deter pests and mold in the cavity-free structure. A simple double-wall metal cladding, along with metal roofing shaded by solar panels above a three-inch ventilated airspace, creates a ventilated double skin greatly reducing heat gain. All glazing is operable and north facing and/or shaded to prevent direct sunlight, and to optimize natural ventilation and comfortable airflow. Interior surfaces are low-VOC products. Exposed beams are FSC certified glue-laminated timbers combined with steel trusses to trace primary structural forces. Interior surfaces are naturally finished, low-VOC materials to provide good interior air quality.

For more information about the Modular Building Institute, upcoming conferences or the Partners in Education program, visit www.modular.org.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • NWEA Report Recommends K–12 Natural Disaster Recovery Strategies

    The Northwest Evaluation Association (NWEA), a K–12 assessment and research organization, recently announced the release of a new playbook for schools and communities recovering from extreme weather events, according to a news release.

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part I

    We asked, you answered, and the results are in! Last year, we put out a call for submissions to collect our readership’s opinion on trends and predictions for K–12 and higher education facilities in 2026.