Washington Adventist University Opens New $1.8 Million Ball Field

TAKOMA PARK, MD — Washington Adventist University (WAU) officially opened its new $1.8 million artificial turf ball field in Takoma Park, MD, on September 9. The event was celebrated with the university’s first men’s soccer team home game of the season, and a dinner. The ball field includes new lights, a new scoreboard and new bleachers.

“This new ball field is another exciting enhancement to WAU’s campus, and it represents another step forward in our efforts to turn this good university into a great university,” says Washington Adventist University President Weymouth Spence, Ed.D, R.T. “The new field will better serve our students, faculty and staff, and the community.”

The field — which will accommodate soccer games, intramural sports and a variety of community activities throughout the year — is part of an overall effort by WAU to improve its physical campus. During the past five years, the university has made investments of more than $16 million, reaping visible and effective results. The list of completed projects includes a new $6.3 million music building; a $1.2 million dining hall renovation; a $1.1 million activity center; and a host of smaller renovation projects that include new paint, furniture and flooring in the dormitories, classrooms and library.

Transforming the physical campus is part of Washington Adventist University’s Vision 2020: Growing with Excellence plan, which is guiding the university’s metamorphosis into one of the premier small universities in the mid-Atlantic region.

Featured

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • restroom sinks

    CSU Dominguez Hills Standardizes Plumbing to Improve Restroom Maintenance and Efficiency

    At California State University, Dominguez Hills, facilities leaders have taken steps to standardize restroom fixtures as part of a broader effort to improve maintenance efficiency and control long-term costs.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition