THE CHALLENGE

The new Dover High School in Dover, Del., is situated on the site of a former soybean farm. As a result, Wilmingtonbased ABHA Architects wanted to retain some of the natural aspects of the site while providing a productive learning environment.

Dover High School

The design team that worked on the new Dover High School in Dover, Del., wanted to incorporate the look of wood into many of the school’s feature areas. The panels in the library look like wood, but are actually MetalWorks Wall Panels and MetalWorks Torsion Spring Ceiling Panels from Armstrong. To meet the acoustical needs of the library, the panels are perforated and backed with a fiberglass infill, resulting in a system in which the panels absorb 90 percent of the sound that strikes them.

THE SOLUTION

To help reach its goal, the firm’s design team incorporated the look of wood into many of the school’s feature areas. In the school’s tall, light-filled library, for example, wood-like panels are installed on the wall and ceiling of a tiered, second-floor lecture hall that overlooks the library and extends into it.

While the panels look like wood, they are actually MetalWorks Wall Panels and MetalWorks Torsion Spring Ceiling Panels from Armstrong. Made from lightweight aluminum, all the panels feature a Reflections wood-look visual created by bonding a printed vinyl onto the aluminum.

Project Architect Carl Krienen explains that MetalWorks panels were chosen over real wood because of their flexibility and economy. “The bowed nature of the lecture hall wall in combination with the radial nature of the sloped ceiling presented a real geometric challenge,” he states. “However, the MetalWorks panels proved to be a very effective system compared to wood, and made it possible for us to economically get the look we were trying to achieve.

“In addition, the Torsion Spring ceiling panels install in a concealed grid system which allows them to butt up against each other,” Krienen continues. “This deemphasized the joints and produced the consistent plane we wanted on both the wall and ceiling surfaces.” The panels also provide downward accessibility to the plenum.

To meet the acoustical needs of the library, both the wall and ceiling panels are perforated and backed with a fiberglass infill, resulting in a system in which the panels absorb 90 percent of the sound that strikes them.

IMPACT ON LEARNING

“Numerous studies have shown that an abundance of natural light and good acoustics are critical to learning,” Krienen states. “In the Dover library, we were able to accomplish both as well as create an environment that makes students feel welcome.”

Editor's Review

According to a study entitled, “Effects of Classroom Acoustics on Performance and Well- Being in Elementary School Children: A Field Study”, conducted by the University of Kaiserslautern, in Germany, children are more impaired than adults by unfavorable listening conditions such as reverberation and noise. The study found that reverberation has “significant effects” on speech perception and short-term memory of spoken items. They also determined that the children from reverberating classrooms performed lower in a phonological processing task, reported a higher burden of indoor noise in the classrooms, and judged the relationships to their peers and teachers less positively than children from classrooms with good acoustics. The decision makers in the Dover High School project obviously understand the importance of good acoustical conditions in classrooms.

This article originally appeared in the issue of .

Featured

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition