THE CHALLENGE

Towson University needed a lighting solution that would produce a brighter and more uniform light to the playing surface at Burdick Intramural Field. The university was also looking to reduce spill light from its previous installation to improve playability for students and eliminate neighbor complaints.

Towson University

Musco’s Light-Structure Green™ system — complete from foundation to pole top in 5 Easy Pieces™, cuts operating costs, reduces spill light and glare, eliminates maintenance with a 25-year warranty, provides constant light levels and includes system monitoring and remote on/off control services with 24/7 support.

THE SOLUTION

Musco offered the Keystone Purchasing Network’s (KPN) contract for field lighting and delivered a solution that helped Towson University meet all of its goals. With Musco’s Light Structure Green solution, spill light and glare were vastly reduced at the university. Maintenance and operating costs were eliminated with Musco’s 25-year warranty that allows for 24/7 remote on/off control services and system monitoring.

Providing this solution for Towson University was possible in large part because of Musco’s bid-awarded contract with KPN, which greatly benefited the project. KPN is a national cooperative purchasing program that performs a public, sealed bid process and awards contracts to the lowest responsive and responsible bidder. Musco is one of many contracts that KPN’s members can utilize.

“Using KPN allowed for a faster procurement which greatly helped with this project since the planning, development and schedule were condensed for this work,” says Towson University Burdick Field Project Manager Jonathan Lindhorst.

Also, because of the location of the campus, the project encountered shallow rock that altered its foundation. Musco was able to redesign the footing and foundation of the light poles to work around the problem and meet the project’s installation schedule.

“The construction process for this project went very smooth. There were very few unknown circumstances that popped up throughout the project duration. This project has impacted the university in a very positive way,” Lindhorst says.

IMPACT ON LEARNING

Towson is now able to program more intramurals activities without needing to worry about spill light and glare, improving playability on the field for students without disturbing neighbors.

“The new lighting installed is a terrific upgrade than what was previously existing,” Lindhorst says. “The previous lights had no cutoff shields to prevent light spillage. This was a problem for the neighbors around campus. The new lighting is more even and brighter than what previously existed and has cutoff shields that greatly reduce any light spillage to the neighbors around the university.”

Musco’s lighting solution will save Towson University nearly $500,000 over the next 25 years in maintenance and operating costs.

Editor's Review

The Lighting Research Center advises that fixed outdoor lighting supports nighttime activities, including recreation, and as with any lighting system outdoor lighting should maximize the benefits to people while minimizing cost. By doing its homework, Towson University arrived at a lighting solution for Burdick Intramural Field that uses state-of-the-art technology to successfully light the field and expand playability for students while also fostering an improved town-gown relationship by reducing light spillage to the surrounding neighborhood. Additionally, the solution impacts the university’s bottom line, saving money that can be used to further the educational goals of the institution.

This article originally appeared in the issue of .

Featured

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.