Metal Roofing - a Durable and Sustainable Option

Buncombe County Schools, in Asheville, NC. sought to relieve overcrowding in eight existing schools with the simultaneous construction of two new intermediate (grades 5-6) schools. The twin 107,000 square-foot facilities are identical in design and offer students a unique sense of discovery.

Sustainability was a driving directive for the design of the schools provided by Architectural Design Studio (ADS), Asheville, N.C. The project is slated for LEED Silver status.

Eblen Intermediate School utilizes a colorful variety of PAC-CLAD profiles. “Metal was the natural choice to use on the roof of the buildings,” according to ADS Principal Mike Cox. “School construction has been my primary focus for many years and my emphasis has always been durability. Metal gives us more durability and longer life than other materials.”

Site limitations caused some challenges with daylighting, according to Cox. “Daylighting was one of the features we really wanted to get into the buildings,” Cox says. Both buildings are oriented east/west. ADS’ solution was to design construction of large vertical skylights, called “monitors”, for each classroom. “The monitors are designed to get daylight in the classrooms year-round but to completely avoid the entry of direct sunlight. It’s all reflected light — any day, any time, any time of year — there’s no direct sunlight.”

Installation of the PAC-CLAD material, supplied by PAC distributor Commercial Roofing Specialties, Inc., College Park, Ga., was done by Peach State Roofing of Lawrenceville, Ga. “It was a challenging job due to the complex design and the phasing and coordination with the various trades,” says David Schmitt, vice president. “The monitor skylights were built with metal stud framing and clad with the Petersen material. The trim packages all required individual measurements. But the end product really turned out great.”

www.pac-clad.com

This article originally appeared in the issue of .

Featured

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

Digital Edition