Solutions for Cable Management

Many universities and colleges recognize the growing need to provide their students and faculty access to technology throughout the campus. However, many historic campuses date back to the mid-1850s, with many of the current academic and administrative buildings having been built in the 1950s, 1960s and 1970s. Due to the age of much of the infrastructure most universities are ill equipped to conveniently bring power, data and A/V access to where it is needed for today’s technology.

Finding the solution needed to bring power, data and A/V access and cable management to every classroom, library and office can be a daunting task, and often core drilling is seen as the only option. Core drilling involves drilling holes in the concrete floor slab, installing conduits through these holes and routing them beneath the floor slab to the new poke-through device. With trenching, a portion of the concrete floor slab is saw-cut and removed. Conduits and electrical devices are put in place and the floor slab is then patched with new concrete. Many are discovering, though, that the costs of core drilling and trenching are too expensive. According to a recent RSMeans study, avoiding core drilling or trenching and using an alternative method can save 50 percent or more.

The growing need for retrofitting campuses is unabated and institutions must think beyond solutions invented nearly a century ago. The keys to success are to effectively and affordably bring power, data and telecommunications from the wall to wherever it is needed while having the flexibility to adjust and grow as technology continues to evolve.

This article originally appeared in the issue of .

About the Author

Clint Strong, CEO of Connectrac® (www.connectrac.com), is the company’s founder and a licensed architect. Connectrac is the new standard in modular, bringing cable management in all interior applications, supplanting expensive core drilling with its floor-based wireway. Contact Clint at [email protected].

Featured

  • Pittsburgh High School Upgrades Athletics Facilities’ Technology

    Plum Senior High School in Pittsburgh, Penn., recently partnered with South-Dakota-based Daktronics through the We’re All Mustangs Here Foundation to upgrade the technology in its athletics facilities, according to a news release. Daktronics designed, built, and installed new LED video displays and finished the project in time for the beginning of the 2025 high-school football season.

  • Florida SouthWestern State College, Skanska Partner for Humanities Hall Renovation

    Florida SouthWestern State College (FSW) in Fort Myers, Fla., recently announced that it is partnering with construction firm Skanska to renovate the school’s Humanities Hall, according to a news release.

  • Creating Long-Term Sustainability on College Campuses Through Fair Student Housing

    The quality of student housing can have a significant impact on an individual’s college experience. Today’s higher education institutions face mounting challenges, including declining enrollment, low retention rates between the first and second years, and a rise in student mental health concerns. Thoughtfully designed living spaces can help address these issues by creating environments that promote both academic focus and personal well-being.

  • Empowering People Through Smart, Sustainable Campuses

    Sustainability is facing increasing scrutiny, with some questioning its costs and priorities. Yet for universities, it remains an essential driver of resilience, operational efficiency and long-term competitiveness. At the same time, there is a growing recognition that sustainable transformation is not just about reducing energy consumption and emissions to comply with tightening regulations ‒ it’s about creating vibrant, comfortable environments where people can thrive, innovate and connect. For university leadership, this is a complex balancing act, with rising energy costs and limited budgets only adding to the challenge.

Digital Edition