Synchronized Clocks Make Learning Easier

Royalton Public Schools serves approximately 950 students in preschool through grade 12 in Central Minnesota. Its elementary school building and its combined middle school/high school campus are located one half-mile apart.

The elementary and middle school/high school relied on wired clocks throughout their buildings, but none of the clocks were synchronized. This caused many problems for students and teachers.

For example, students had five minutes to dress and get to the bus stop at the end of the day. When clocks were a few minutes off, it caused students to be late, or nearly miss the bus.

One teacher lost three minutes of prep time every day because his students showed up too early from another class.

Tony Duevel, building and grounds director at Royalton Schools, began evaluating synchronized timekeeping systems that would keep all of the clocks showing the same, precise time. This would help the schools operate more efficiently, give students and teachers a better experience, reduce tardiness problems and cut down on maintenance costs.

Duevel selected the American Time SiteSync IQ Hybrid Clock System for the Royalton elementary and middle school/high school.

SiteSync IQ could integrate with Royalton’s existing wired clock system along with any new wireless clocks that they installed — an excellent solution for a district that wanted to replace many, but not all, of its clocks.

“I’ve gotten lots of positive feedback from teachers and staff about how helpful it is to finally have synchronized time. Every clock, computer and device in our schools shows the exact same time,” says Duevel.

“Even a bus driver commented on how much easier it is for them to stay on time because all of our students are coming out at the same time instead of three or four minutes apart. We’re very happy with the service!”

www.american-time.com

This article originally appeared in the issue of .

Featured

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

Digital Edition