Hellas Construction Begins $6.3 Million Dollar Project at Sterling City ISD

Austin, Texas - Construction crews mobilized this past Monday at Sterling City Independent School District to begin a new $6.3 million multi-sport athletic complex. The project is expected to be completed by February of 2016.

“The community is excited about this project and continues to be very supportive of our students, athletes, and school district,” said Sterling City ISD’s Superintendent Bob Rauch. “We’re also thrilled to work with Hellas Construction as they have an excellent track record of finishing projects on time.”

After demolition of the site’s existing sports structures, Hellas will begin construction of a practice facility that will include a football field and running track. The field will feature Hellas’ exclusive Matrix® Turf, the same artificial turf used by the Dallas Cowboys at the AT&T Stadium, Baylor University’s McLane Stadium, and Allen ISD’s Eagle Stadium. Hellas will also be installing an epiQ TRACKS® Q3000, a full-pour 10mm running track system that provides a fast and durable all-weather surface for athletes.

Hellas will also construct eight post-tension concrete tennis courts with TPS® 5000 surfacing and a covered basketball court. The courts will feature player benches and chairs, along with shaded structures and spectator bleachers. The tennis complex will be completed with a locker room facility for athletes.

Hellas will round out the project with a new mile-long fitness trail that features shaded structures and fitness stations. Additional facilities and amenities will be built throughout the site, including a concession stand and restroom building, a new pump house for the existing swimming pool, and renovated roadways and parking lots with decorative entryways. Hellas’ extensive lighting system will illuminate all areas of the project, including the playing fields, roads, walkways, trails, courts, and more.

The project was designed by Parkhill, Smith & Cooper, an architectural and engineering design firm originally established in Lubbock, Texas. “I love working with PSC,” commented Hellas President Reed J. Seaton. “We have been very successful working together in past projects.”

Featured

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition