Prior to the reorganization and addition of equipment cabinets, the media storage room was messy, disorganized and even a bit dangerous. Now, students and staff can find what they need when they need it.

THE CHALLENGE

Henry Sibley High School’s media storage room was a mix of old library shelves, second-hand cabinets and a used pegboard. Multiple users and events made organization difficult, as equipment was piled and stacked haphazardly.

THE SOLUTION

Wenger evaluated the size of the AV storage room and the equipment being stored before making recommendations. Then Wenger provided a variety of fixed and mobile media storage cabinets designed to accommodate every piece of AV equipment.

Three models of fixed cabinets were installed — standard, rackmount and organizer — with a variety of shelves, drawers and options. The organizer model features a wire grid inside the door and back panel designed to accommodate hooks, and other accessories: baskets, cable minders, mic stand holders and CD racks.

“Our new cabinet solution is night and day better than what we had before,” declares Dann Hurlbert, AV Specialist & Film Studies Instructor. “The cabinets are beautiful and really help keep the room looking clean.”

Henry Sibley High School

BEFORE

The room still contains the same equipment as before, but everything is organized in designated locations and out of sight. Space utilization also improved dramatically.

IMPACT ON LEARNING

Organizing and safeguarding all this valuable equipment helps ensure it will be available and operational when needed throughout the school. AV equipment represents a sizable investment, often acquired over multiple budget years. Hurlbert appraises HSHS’ inventory at more than $50,000, including two LCD projectors, four speakers, a mixer and “lots of little things that add up.”

He sees a growing proliferation of AV equipment today — equipment components are becoming smaller and more numerous. This makes organization more challenging, and more essential.

Editor’s Review

We often do not realize that AV equipment can become unwieldy and take up many square feet of storage space. In the changing education environment, with the need for alternative learning spaces, etc., using available space in an efficient manner is always welcome. In this instance, the school administrators were able to better utilize the storage space, provide a more secure storage arrangement for expensive equipment and, as a bonus, by having it so much better organized, free up students’ and teachers’ time for longer instruction and rehearsals.

This article originally appeared in the issue of .

Featured

  • StarRez Releases 2025 State of Student Housing Report

    Student housing software solutions provider StarRez recently released its second State of the Student Housing Industry Report, according to a news release. The report is based on the results of survey data from more than 400 higher education institutions around the world, both StarRez clients and not.

  • EPA to Provide $26M in Grants to Protect School, Child Care Drinking Water

    The Environmental Protection Agency (EPA) recently announced that it will award $26 million in grant funding to test and fix lead-contaminated water at U.S. schools and childcare centers, according to local news.

  • Spaces4Learning Announces Winners of 2025 Product Awards

    Spaces4Learning has just announced the winners of the 2025 Product Awards! The award program recognizes innovation and excellence in products that enhance learning environments in K–12 schools and institutions of higher education.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

Digital Edition