Making the move from library to media center

library to media center

Creating a space for collaboration and education was first priority when it was time to update the Sycamore High School Library. School Outfitters helped make this a reality with ease.

As Angela Webb, director of Sales at School Outfitters, walked the halls of Sycamore High School, the first thing she noticed was the library — and that there was no one in it. The large space was full of potential, but completely outdated. Shelves were lined with old periodicals now accessed online, furniture was not conducive to learning, and the room was dim and drab; students went to the library because they had to — not because they wanted to.

Doug Mader, Sycamore’s principal, expressed a clear vision to Webb: a “Starbucks vibe”, where students would come in, hang out and do work. Webb, who had worked with Mader on other projects, was eager to take on the challenge.

She met with the architects to talk about the colors, design and layout of the space. Together, the team discussed what the students would be using it for, and what types of furniture would be most effective. The space needed to foster community and collaboration; the furniture needed to be versatile, modern and comfortable. It needed to encourage group work. And, there needed to be plenty of spots to charge electronics.

To meet these demands, Webb chose mobile furniture that could be easily configured for various-sized groups, as well as comfortable pieces for reading or studying independently — many of which include built-in power. The team also incorporated a series of Learniture Shapes furniture — versatile seating that doubles as a work surface and fits together in a number of ways — as well as a “hive” centerpiece, where groups can gather for semi-enclosed conversations.

Well into its first year of use, the library now buzzes with activity. Full of students and teachers all day long, the library does just what everyone hoped it would: provide a space for collaboration, education and preparation for the future.

www.schooloutfitters.com

This article originally appeared in the issue of .

Featured

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

  • ClassVR Wins Tech & Learning Best of Show at ISTELive 25

    Avantis Education recently announced that its flagship product, ClassVR, won the Tech & Learning Best of Show Award at ISTELive 25 in San Antonio, Texas, according to a news release. The program is designed to celebrate products that are “transforming education in schools around the world and that show the greatest promise for the industry,” and this is the fourth consecutive year that Avantis has claimed the award.

  • Delta State University Completes Renovations to School of Nursing Facilities

    Delta State University recently completed a major expansion and renovation project for the Robert E. Smith School of Nursing facilities on its campus in Cleveland, Miss., according to a news release. The project includes about 14,000 square feet of new construction and more than 21,000 square feet of renovation work to the existing space.

  • Elevating Campus Maintenance: How Power Wash Drones are Transforming Educational Facilities

    As today’s campuses grow larger and more architecturally complex, keeping exteriors clean, safe, and inviting has never been tougher. Facilities leaders are under constant pressure to stretch budgets, meet safety standards, and support sustainability goals—all while tackling the stubborn challenge of exterior cleaning.

Digital Edition