What Results Should You Expect When Cleaning Is Genuinely Ergonomic?

The word ergonomic gets used abundantly in regard to cleaning, but that is because the primary resource in cleaning is manual labor. When you’re working with manual labor, good ergonomics have the potential to transform just about every aspect of the work with safer, more intuitive processes and tools. Put simply, for something to be ergonomic, it must be efficient and people-friendly. That can apply to every cleaning task from vacuuming the carpet to dusting the light fixtures.

That said, there is a difference between transformative ergonomics and superficial ergonomics. An example of superficial ergonomics would be to take a heavy and unwieldy tool and put a more comfortable handle grip on it. The hand might be more comfortable, but the task is still difficult to perform. Transformative ergonomics in cleaning could come from a drastic rethinking of how a task is done or from a slight tweak, but the improvements in your cleaning program should be undeniable if you are tracking key information.

When considering a switch to a new ergonomic approach, conduct your own in-house study to compare your existing method with the new ergonomic method. First, work with a cleaner on how to use new equipment or follow a new process properly. Then time how long it takes the cleaner to do the same task in the same space with both methods, and document the quality of the results. Afterwards, give cleaners a questionnaire about how intuitive the new method is and their physical comfort doing the task. After tracking these factors, the benefits of ergonomic methods should become apparent.

This article originally appeared in the issue of .

About the Author

Jacalyn High is director of Marketing for ProTeam Vacuums. She can be reached at 866/888-2168 or through proteam.emerson.com.

Featured

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.