How to Increase Access to Power in the Classroom

Most students use mobile electronics to learn. With that, students are more often finding themselves in difficult situations where they’re watching their smart phone, laptop and tablet batteries drain without an accessible power outlet nearby. The trend contributes to a rising epidemic of disengagement and lack of focus in the classroom.

Installing power sources can be costly and time consuming. Traditional construction methods like trenching, coring and raising floors can render classrooms unusable for extended periods of time. Often the cost is prohibitive. An alternative solution can be found in ultra-thin power grids laid seamlessly under carpet. This option is designed to provide learning spaces with power where and when students and instructors need it. Unlike other techniques, it requires no upheaval of existing structures and is a simpler and cost-efficient power distribution system.

Steelcase Research has revealed that 70 percent of students are taking notes on laptops instead of paper. In higher education, this number is even larger, as 95 percent of institutions allow mobile devices in classrooms. Not surprisingly, 20 percent of college students say it is difficult to charge their devices on campus. While schools are attempting to be “bring your own device friendly,” their classrooms and other campus spaces lack the easy connection to available electricity.

People need technology and technology needs power. As we ask how we can better meet student’s needs, we need to consider the spaces they are using. Instead of making students go to the power source, let’s bring the power to them and create more efficient, less distracting learning environment.

>> Through evidence-based design, technology and innovative solutions, Steelcase Education is focused on helping schools create the most effective, rewarding and inspiring active learning environments.

This article originally appeared in the issue of .

Featured

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

Digital Edition