Northwestern University

Project Snapshot

PROJECT: Sustainable Campus Transportation
INSTITUTION: Northwestern University
LOCATION: Evanston, IL
COMPANY NAME: Polaris GEM
WEBSITE: GEMCar.com

Northwestern University

Polaris GEM electric vehicles help in the quest to keep facilities looking great and also serve as a sustainable feature on campus that helps benefit students, faculty and staff with cleaner air.

THE CHALLENGE

There’s a transportation revolution taking place at world-renowned Northwestern University in Evanston, IL. It started in 2009 when Northwestern — in keeping with its commitment to sustainability — challenged facilities leaders to reduce greenhouse gas emissions 30 percent by 2030.

Northwestern’s facilities operations accepted and met that challenge. And today, among the bustle of more than 20,000 students, they use a fleet of 10 Polaris GEM electric vehicles to traverse the university’s 240-acres, quietly and sustainably maintaining the pristine campus.

Northwestern’s commitment to sustainability spurred them to look at replacing a number of gas-powered machines with GEM vehicles beginning in 2015. After starting with a small fleet of four, the university now is up to a fleet of 10. “Gas savings was a contributing factor,” says Samantha Kustra, procurement analyst at Northwestern University, “but decreasing greenhouse gas emissions was the real reason for moving to electric vehicles.”

THE SOLUTION

The go-anywhere combination of street legal and “off-road” capability was also key factors in Kustra’s choice to go with GEM electric vehicles. The ability to drive on roads or across turf and other terrain offers flexibility not found in golf carts and other vehicle options.

Northwestern University“When we initially started looking into electric utility vehicles, two of the major requirements were that they be street legal, but also that they could be driven on lawns,” adds Kustra. “GEM gives us a zero-emissions, street-legal vehicle that allows our staff to get anywhere on campus.”

Bordering Lake Michigan north of Chicago, the climate at Northwestern ranges from hot summer days to sub-zero winter nights. Frequent travel across campus at all hours and in any weather makes automobile-like features such as an enclosed climate-controlled cabin, defrost, seat belts and exterior lighting highly desirable.

“Our employees have had positive reactions to the power steering, roomier cab and cargo space. It’s logical that the more comfortable a driver is the safer the journey, too. GEM is easy to get in and out of, and can carry all kinds of equipment and people anywhere we need to go.”

IMPACT ON LEARNING

Northwestern’s GEM fleet was configured with customizable utility and storage features to meet the university’s unique needs. Students, faculty and staff are benefitting from cleaner air and a well-maintained campus. Polaris GEM is proud to be helping Northwestern run leaner and greener.

Editor’s Review

A campus with hundreds of acres of property and a commitment to sustainability — often cited by students as a determining factor in their selection of a college or university — is wise to invest in electric vehicles for its maintenance fleet. Savings are realized, carbon emissions are reduced, students have a visual affirmation of the institution’s commitment to sustainability and facilities staff have the tools they need to maintain a healthy campus for all.

This article originally appeared in the issue of .

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition