Everything Old Is New Again

As I look back through our archives at some of the most significant trends in education, it is interesting to note that what seems like a new problem or a new idea most likely is not. Chances are that if you look back in history, you will see an older version of that “new” idea. Sometimes the idea sticks. Occasionally we find ourselves doing a complete 180.

Sustainability — On April 22, 1970, we celebrated the first Earth Day, putting air and water pollution and other environmental concerns on the front page. The sustainability movement took hold in the building and construction industry some 20 years later (1993) when the USGBC was established; the LEED rating system was unveiled in 2000. The Center for Green Schools was launched in 2010. Today, building sustainable schools is routine practice.

Energy and Design — With the OPEC oil embargo of 1973, oil prices jumped 350 percent. Through the early 1980s numerous articles were written on making schools more energy efficient. New mechanical systems were installed. Large windows, prevalent in older buildings, were closed off to save on heating and cooling costs. What wasn’t taken into account was the negative impact this would have on natural ventilation, light and the indoor-outdoor connection. Current research shows the positive effect of natural light on students. Windows are being added and historic windows are being restored.

Science and Technology — In 1957 the talk was about the Soviet Union, Sputnik, the space race and how American students were falling behind in math and science. Our strategy was to emphasize math and science and to expand vocational programs. The focus quickly faded. Fast-forward to the 2000s when global rankings, the economy and workforce development took center stage, and there was a renewed emphasis on what we now called S.T.E.M. Outside factors — jobs, and the idea that the U.S. has “fallen behind” — have been the drivers of this movement. The real driver should be our belief that students need the ability to think critically, problem-solve and collaborate to succeed.

Open Classrooms and Makerspace — In the ’60s and ’70s it was all about the open classroom. In the ’80s it was back to basics and the open classroom idea died. Today it is once again about active learning and collaboration, makerspaces where students can create and a focus on student-centered learning. My question is not so much about the space, but how we are training teachers to use it. We will need to say tuned to see if it sticks this time around!

This article originally appeared in the issue of .

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition