An Electric Utility Vehicle for Both People and Cargo

Polaris GEM

Built with quality and durability in mind, GEM from Polaris helped the Electrical Maintenance department at Cleveland State University get more work done both indoors and out.

When Cleveland State University’s (CSU) Electrical Maintenance department needed a new utility vehicle, their choice was the Polaris GEM. The electric GEM eL XD low-speed vehicle helps the department tackle just about any maintenance task without needing to fuel up.

“We knew we wanted an electric utility vehicle, and we chose the GEM eL XD because of the number of configurations offered,” says David Pekala, crew leader for CSU’s Electrical Maintenance department. “We were able to customize the machine to fit our needs, adding a 44-inch cab L-Box to protect cargo.”

The GEM eL XD is the first vehicle of its kind to offer a recessed bed option to lower loading height and maximize hauling capability. More than 20 bed configurations and a wide variety of accessories are available for full customization. Pair these options with the GEM’s generous ground clearance, 1400-pound payload capacity and safety features and you’ve got a work vehicle you can count on.

“The GEM gets us from point A to point B quickly and it fits into tight spaces,” adds Pekala. “It goes where our other vehicles can’t.” Because it is electric, the GEM eL XD can be driven indoors as well as out. It handles off-road areas such as turf and sidewalks and is legal to drive on streets in most states and provinces, typically on roads marked up to 35 mph.

Built with quality and durability in mind, GEM features an aluminum chassis that passes SAE roof-crush-test standards, front-wheel disc brakes, an automotive-style suspension and a variety of maintenance-free battery options. The result is a reliable, zero-emissions vehicle with a smoother ride. Whether you’re moving people or cargo, GEM utility vehicles get the job done easily and efficiently.

www.polaris.com

This article originally appeared in the issue of .

Featured

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • Florida SouthWestern State College, Skanska Partner for Humanities Hall Renovation

    Florida SouthWestern State College (FSW) in Fort Myers, Fla., recently announced that it is partnering with construction firm Skanska to renovate the school’s Humanities Hall, according to a news release.

  • Ryan Companies Completes Construction on Three U.S. Charter Schools

    Ryan Companies US, Inc., recently partnered with Red Apple Development (RAD) and Charter Schools USA (CSUSA) to build three new charter schools in South Carolina and Louisiana, according to a news release. Ryan served as general contractor with RAD as the developer of record.

  • Anderson Brulé Architects Rebrands as ABA Studios

    Anderson Brulé Architects, based in San Jose, Calif., recently announced that it is celebrating 40 years of service by rebranding under a new name, according to a news release. The architectural, interior design, and planning firm will now be known as ABA Studios to refresh its identity underneath a new generation of leadership.