Colorado State University Biology Building

Hord Coplan Macht

Project of Distinction 2017 Education Design Showcase

Colorado State University Biology Building

Project Information

Facility Use: 4-year Institution
Project Type: New Construction
Category: Laboratories/Research Facilities
Location: Fort Collins, CO
District/Inst.: Colorado State University
Chief Administrator: Tracey Abel
Completion Date: August 2017
Gross Area: 134,500 sq. ft.
Area Per Student: 63 sq. ft.
Site Size: 2.21 acres
Current Enrollment: 1,550 Undergrad/115 Graduate
Capacity: 1,800 students
Cost per Student: $38,888
Cost per Sq. Ft.: $456
Total Cost: $58,000,000

The new $58 million Biology Building on the Colorado State University (CSU) campus is a four-story, 154,000-square-foot teaching and research facility designed by Hord Coplan Macht. The firm recently completed both the Biology Building and a $41 million Chemistry Building. The two LEED Gold-certified buildings are the anchors of the growing CSU Science Commons and are adjacent to the future Health Education Outreach Center, which is also currently being designed by the firm.

Colorado State University Biology BuildingThe biology building was designed to house the CSU Biology Department, including research labs, special collections used for teaching, faculty offices and idea space for collaboration. A large portion of the building is also dedicated to classrooms, teaching labs, student common spaces, advising and tutoring offices, and study rooms. The biology department is the largest in the College of Natural Sciences at CSU, with more than 1,400 undergraduate students studying in the Biological Science or Zoology majors. The project was completed by a design-build delivery method with Hord Coplan Macht as architect and Haselden Construction as general contractor.

The biology and chemistry structures were built in tandem, utilizing different delivery methods, allowing both projects to minimize costs and create a thoughtful, new, unified Science Commons. The evolving CSU Science Commons includes bike and pedestrian paths, outdoor seating areas, native plant landscaping and an integrated storm water recapture system.

The new biology building provides opportunities for hands-on laboratory work for undergraduate students, both in class and in working with faculty members on their research. The “science on display” design of the building allows a view into the labs from the hallways through glass panels.

“It’s designed to foster more interaction,” says Mike Antolin, professor and chair of the Department of Biology, “and it has the flexibility to be able to meet unanticipated future needs.”

The new Science Commons showcases CSU’s dedication to providing a state-of-the-art science education to their students. All three buildings focus on providing open and adaptable laboratories for researchers and their teams. All of the labs are daylit, where appropriate, with views to the outside making the spaces ideal for science exploration.

Colorado State University Biology Building Colorado State University Biology Building

Judges Comments

The display walls are the strength of this project. The use of terrazzo is a good choice for both appearance and longevity. Nice use of materials.

Architect(s):

Hord Coplan Macht
JENNIFER CORDES
303/607-0977

Featured

  • Three U.S. Universities Install Acre Security Access Control Platform

    Cloud-native physical and digital security solutions company Acre Security recently announced that it has deployed its access control platform at three major universities in the U.S., according to a news release. Acre partnered with Atrium Campus to provide coverage for more than 69,000 students at the University of Virginia (UVA), George Mason University, and Rockhurst University.

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Kenall Introduces Millenium Flair Series

    In a move aimed at modernizing institutional lighting without compromising on durability or performance, Kenall has launched its new Millenium Flair series, according to the Kenall website.