Academic Building Completed at UMass Amherst

The first and largest cross-laminated timber (CLT) academic building in the U.S. has opened at the University of Massachusetts (UMass) Amherst. Designed by Leers Weinzapfel Associates, the multidisciplinary John W. Oliver Design Building brings together 500 students and 50 faculty across four departments into a light-filled 87,000-square-foot space. As a beacon of sustainability, the building features energy-saving elements, such as chilled beams and radiant flooring, and targets LEED Gold certification.

UMASS Amherst Cross Timber Building

Photo: Albert Vecerka / Esto

Cross-laminated timber has long been praised for its durability, lightness, and speed of construction, however, has been slow to catch on in the U.S. relative to Europe and Canada. As the largest installation of wood-concrete composites in North America, the UMass Design Building paves the way in a growing trend of “mass timber” buildings. Cast-in-place concrete and CLT make up the Design Building’s floor slabs, while glue-laminated timber was used for the posts, beams, shear wall cores, and “zipper” trusses.

To reference the colors and patterns of the nearby forests, the four-story building is wrapped in a durable envelope of copper-colored anodized aluminum panels punctuated with vertical windows. The glazing and skylights maximize daylight to the interior to reduce reliance on artificial lighting. Stormwater is managed onsite with bioswales and timber dams that filter and redirect runoff back to the Connecticut River.

“To create a center space of collaboration, a coiling and rising band of studios, faculty offices and classrooms surrounds a skylit commons for gathering and presentations,” write the architects. “The building also forms a green roof terrace, a contemplative space shared by the studios and faculty and a potential experimental space for the landscape department. The slope of the site creates a tall four-story façade on the west facing the mall, and the rising structure invites the community into the building and reveals the activities within.”

Featured

  • i-PRO, NovoTrax Partner for New School Emergency Response Solution

    i-PRO Americas, Inc., which manufactures edge computing cameras, recently announced a partnership with NovoTrax, provider of end-to-end life safety and mass notification solutions, to address gaps in emergency response workflows at K–12 schools, according to a news release.

  • Image courtesy of Armstrong International

    The Modern Hot Water System Approach to Keep Higher Education Buildings Safe and Operational

    Higher education campuses face unique structural and operational demands. With a range of old and new buildings, a variety of facility types, and ambitious sustainability goals, it's essential that no aspect of infrastructural performance is overlooked. Facility managers must be equipped to provide a safe, reliable and efficient space for students, faculty and guests.

  • Embry-Riddle Breaks Ground on New Office Building

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced that construction has begun on a new office building for its campus Research Park, according to a news release. The university partnered with Hoar Construction on the 34,740-square-foot Center for Aerospace Technology II (CAT II), which will be used for research and lab purposes.

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

Digital Edition