Two School Construction Projects Completed in New York City

PS 338 Brooklyn NYEW Howell Construction Group, one of the region’s leading education, retail, cultural, government and healthcare builders, has completed two school construction projects for the School Construction Authority—P.S. 338, a new primary/intermediate school on Coney Island Avenue in Brooklyn, N.Y. as well as the expansion and renovation of P.S. 49 in Middle Village, Queens. Both projects were finished in time to accommodate students for the 2017-2018 school year.

Designed by Purcell Architects, P.S. 338 was built from the ground up to accommodate 742 students ranging from Pre-K to eighth grade. The 106,000-square-foot, $68.5-million project features five floors with a partial cellar. The construction comprised two major blocks; a five-story structure with the primary grades on the lower floors and the intermediate classes above. A separate five-story building will include, lower level cafeteria and gymnasium. The building is set back from Coney Island Avenue to provide a buffer from the sidewalk and street. The side streets allow for a drop off area for school buses and a wider sidewalk to ease congestion.  

EW Howell Construction Group was also awarded a contract to construct a 107,000-square-foot addition and renovation, for P.S. 49, a staple of the Middle Village, Queens community for generations. The $31.5-million project was designed by Ciardullo Architects, which kept the building’s original historic 1920s façade detail. The school is a designated site by the NYS Historic Preservation Office for its beautiful brick work and limestone facades. EW Howell added an ‘L’ shaped building to the outdoor area, which allows extra space for outdoor playgrounds and beautiful landscaped views of the Juniper Valley Park, and completed the interior renovation and exterior restoration.

In addition to P.S. 338 in Brooklyn and P.S. 49 in Queens, EW Howell’s Education Division, led by Vice President John K. Hagen, P.E., has completed several more projects for the School Construction Authority, whose mission is to design and construct safe, cost-effective and environmentally sound schools for communities in New York City. EW Howell has also worked on in Manhattan. EW Howell has also been awarded an addition and renovation project for P.S. 303in Forest Hills, expected to be complete in January 2021.

Founded in 1891, EW Howell Construction Group is a leading New York-based General Construction and Construction Management firm with offices in Manhattan and on Long Island.

Featured

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • South Carolina District Starts Construction on $50M Middle School Renovation

    The Aiken County Public School District in North Augusta, S.C., recently held a groundbreaking ceremony for the $50-million renovation and expansion of North Augusta Middle School, according to a news release. The project’s funding comes from the 2024 renewal of a one-cent sales tax approved by local voters.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • New City School

    Turning Crisis into Opportunity: Transforming New City School

    When New City School in St. Louis suffered catastrophic flood damage in July 2022, the event could have marked a serious setback for the 100-year-old institution. Instead, it became a forward-looking opportunity.