CSU, Chico to Break Ground on New Physical Science Building

This week saw the unveiling of the first images of the new Physical Sciences Building at California State University, Chico (CSU, Chico), in Chico CA. The groundbreaking for the new facility, which will include new teaching facilities and equipment, will take place in the fall of 2018. The new building will help emphasize STEM disciplines, and also encourage collaboration between science and engineering students, and the campus community.

CSU Chico

Designed by San Francisco firm SmithGroupJJR and slated to open in Fall 2020, the building will house classrooms and labs for a host of science disciplines including chemistry, physics, and geology. The building also emphasizes spaces for students to come together in indoor and outdoor settings, and use the natural environment campus as a tool to enhance classroom and in-the-field science education. There will also be a hands-on lab space for K-12 students to come learn and work with CSU, Chico Students across a range of science disciplines. 

The new building is being envisioned with sustainability as a key component, with the design team being mindful of energy and water use required by science laboratories, and designing the facility in a way that will maximize overall energy savings. The building is being funded by system-wide Revenue Bond Program along with campus designated reserves.

Featured

  • Case Study Highlights Texas District’s Campus Security Upgrades

    The Taft Independent School District near Corpus Christi, Texas, recently partnered with Intech Southwest Services to revamp its campus security technology system, according to a news release. Intech has released a case study on its website detailing the process that advanced the district’s technology by more than 20 years in less than three weeks.

  • woman looking at futuristic data display

    7 Technology Strategies for Future-Forward Facilities Management

    From college and university systems to K–12 districts, campus facilities and technology leaders must make strategic technology decisions that support both current needs and future possibilities.

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • Zurn Releases New Ductile Iron Frame Trench Drain System

    Zurn Elkay Water Solutions recently released the newest addition to its Train Drench portfolio, the Ductile Iron Frame Trench Drain System, according to a news release. The product is designed for heavy-duty applications like airports, military, universities, and more.