Demolition and Construction Underway at Oregon High School

Junction City High SchoolDemolition and subsequent construction are underway at Junction City High School in Junction City, Ore. A wing of the old school was demolished to make way for a modernized and safer section of the new facility. The new building will be two-stories and have new classrooms with updated science and media labs.

The new Junction City High School will have one main entryway, along with updated security measures. There will be areas for athletic fields and other recreational spaces adjacent to the new school. The new school is expected to be completed in 2021.

Featured

  • Austin International School Library Renovation

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Austin International School has been recognized with an EDS 2025 Grand Prize award in the category of Renovation.

  • Anderson Brulé Architects Rebrands as ABA Studios

    Anderson Brulé Architects, based in San Jose, Calif., recently announced that it is celebrating 40 years of service by rebranding under a new name, according to a news release. The architectural, interior design, and planning firm will now be known as ABA Studios to refresh its identity underneath a new generation of leadership.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

Digital Edition