American Time Announces 2018 Maintenance Hero Contest

DASSEL, MN – American Time, provider of integrated time solutions, is thrilled to announce the 2018 Maintenance Hero Contest. This contest is open to any organization in any industry—private, public, nonprofit, educational or others—that wishes to nominate a valued maintenance professional who routinely goes above and beyond in the workplace but receives little recognition for their efforts.

Nominees for this award must 1) be a maintenance professional, such as a custodian, groundskeeper or maintenance worker/engineer and 2) consistently demonstrate skillful work and go above and beyond to serve others. Go here to view last year’s Maintenance Heroes.

Three winners will be chosen with prizes ranging from $1,000–$3,000 in American Time product credit.

“We were thrilled with the response to our first-ever Maintenance Hero contest in 2017, as we received so many wonderful nominations for maintenance professionals making a positive impact across the country,” says George Wilkes, president of American Time. “We’re happy to continue the contest and spotlight more Maintenance Heroes who are making a difference in their workplace.”

Contest details and the nomination form can be found at http://info.american-time.com/hero-2018. There is no fee to apply or win. Deadline for submissions is Friday, September 14, 2018. Winners will be announced on National Custodial Workers Day on Tuesday, October 2.

About American Time 
American Time manufactures integrated, custom timekeeping and notification systems. It offers the EverAlert communication and emergency notification system for schools, Wi-Fi network clocks, Power over Ethernet (PoE) clocks, battery and digital clocks, as well as a master controller clock with the ability to run on a legacy wired system concurrently with a new wireless clock system. For more information, visit www.american-time.com.

Featured

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.