Boston Public Schools Unveils New STEM Early College Academy

The new $73 million Dearborn STEM 6-12 Early College Academy recently celebrated a ribbon cutting ceremony, and prepares to welcome students for the new school year. The Academy, the first new school construction project for Boston Public Schools in 15 years, is designed to support learning for computer science and engineering, health, and life sciences subjects.

Dearborn STEM Academy

Dearborn features indoor and outdoor learning classrooms, two fabrication labs, a dance studio, 3D printers, and a large media center. The academy will initially serve 488 students, but is designed to accommodate 600 students by 2020. The Dearborn Academy took just over six years to plan, design, and build.

Featured

  • Austin International School Library Renovation

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Austin International School has been recognized with an EDS 2025 Grand Prize award in the category of Renovation.

  • Anderson Brulé Architects Rebrands as ABA Studios

    Anderson Brulé Architects, based in San Jose, Calif., recently announced that it is celebrating 40 years of service by rebranding under a new name, according to a news release. The architectural, interior design, and planning firm will now be known as ABA Studios to refresh its identity underneath a new generation of leadership.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

Digital Edition