California College of the Arts Breaks Ground on New On-Campus Student Housing

In February, California College of the Arts (CCA) broke ground on new student housing in San Francisco. Designed by leading architecture firm Stanley Saitowitz | Natoma Architects Inc., the five-story building will provide much-needed, below-market-rate housing for more than 500 students—roughly 25 percent of CCA’s student body—upon its completion in 2020. The 280 rooms are CCA’s first on-campus housing in San Francisco and are positioned at the center of the school’s expanding campus.

CCA Hooper Student Housing

The building will primarily provide housing to the school’s first- and second-year students. It will include single- and multiple-occupancy units and more than 12,000 square feet of common areas, along with social and study spaces. An inviting, sunlit café on the ground floor of the building will be surrounded by floor-to-ceiling glass windows.

At the ground level, the facility includes 10,000+ additional square feet of outdoor space with landscaped, interconnected courtyards. The building also features a 400-square-foot outdoor deck on the fifth floor. The sidewalk outside the building will expand to accommodate an increase in foot traffic and landscaping. Crosswalks will be added, giving the neighborhood a more residential feel.

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition