CA District Deploying Solar at 8 Sites

Orange Unified School District has begun construction on its first solar project. The installation will include a combination of ground-mounted and shade canopies at eight district sites, generating a projected 3.6 million kilowatts of renewable electricity during the first year of operation. The school system, which has 28,000 students, is working with Ameresco on the project.

The district said the use of solar would reduce carbon emissions by 2,512 metric tons, the annual equivalent of taking 533 cars off the road for a year.

"Transitioning to renewable energy sources such as solar is a cornerstone of this district’s long-term sustainability plan," said OUSD Energy Manager, Andrew Durrett, in a statement.

Under the terms of the agreement, Ameresco will pay all costs, including the design, construction, operation, and ongoing maintenance of the solar panels. Under these kinds of deals, often, the solar project is installed under a long-term "net metering" structure. The district will purchase solar power generated through the installation from Ameresco and sell it to the local utility; in return the district will receive credits that are applied to its utility bills. Because electricity is worth more when it is used to offset a retail bill than when it is sold into the commodity wholesale market, the approach is projected to provide greater savings than having the district buy the electricity from Ameresco and use it directly in its buildings.

"In today’s dollars, the anticipated savings in utility costs to be realized by this agreement is projected at $5.3 million, which has been confirmed by an independent third-party energy specialist," said Assistant Superintendent of Business Services, David Rivera. Money generated through solar savings will be folded into the district's reserves.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • A university

    Breaking Higher Education's Billion-Dollar Backlog Problem

    Strategic mechanical system design can transform campus maintenance backlogs. Here's how.

Digital Edition