Encinitas Middle School's STEM Building Nearly Complete

Diegueño Middle School in Encinitas, California will soon have a new classroom building with ample space for hands-on STEM learning, reported the Encinitas Advocate.

San Dieguito Union High School District has replaced a 35-year-old building with a new building featuring four large general-purpose classrooms, a new computer lab and a makerspace.

The new 1,100-square-foot computer lab can accommodate 38 students with room to spread out. The makerspace includes a polished floor, retractable extension cord wheelset built into the ceiling and a roll-up door for access to an outdoor patio.  

The front of the building will include seating walls, gathering spaces for students, new landscaping and trees.

The building is expected to be completed this fall with students utilizing the building after the winter break.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Case Study Highlights Texas District’s Campus Security Upgrades

    The Taft Independent School District near Corpus Christi, Texas, recently partnered with Intech Southwest Services to revamp its campus security technology system, according to a news release. Intech has released a case study on its website detailing the process that advanced the district’s technology by more than 20 years in less than three weeks.

  • woman looking at futuristic data display

    7 Technology Strategies for Future-Forward Facilities Management

    From college and university systems to K–12 districts, campus facilities and technology leaders must make strategic technology decisions that support both current needs and future possibilities.

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • Zurn Releases New Ductile Iron Frame Trench Drain System

    Zurn Elkay Water Solutions recently released the newest addition to its Train Drench portfolio, the Ductile Iron Frame Trench Drain System, according to a news release. The product is designed for heavy-duty applications like airports, military, universities, and more.