Innovative Boston School Officially Opens in North End

The Eliot Innovation School celebrated the construction of a new, waterfront upper campus with a ribbon cutting ceremony on Oct. 19, attended by Mayor Martin Walsh, Boston Public Schools (BPS) Superintendent Brenda Cassellius, city officials, BPS staff and the community. The $15 million building renovation was part of Mayor Walsh’s $2.08 billion Imagine Boston Capital Plan. It was the final phase of an overall $33 million project to two Eliot school buildings.

The $15 million building renovation was part of Mayor Walsh’s $2.08 billion Imagine Boston Capital Plan. It was the final phase of an overall $33 million project to two Eliot school buildings.

Finegold Alexander Architects served as the architect, Daniel O’Connell’s Sons were the contractor for the project and design and construction was managed by the City of Boston Public Facilities Department.

The 42,000-square-foot facility is the latest addition to Eliot’s three-campus school. One location serves grades K0-1, another serves grades 2-4 and the new school serves about 400 students in grades 5-8.

Transformed from an office building, the school includes 18 light-filled classrooms; collaborative learning spaces; media, arts and tech/robotics spaces on the first floor; and multi-purpose spaces for community meetings. A new exterior play space is accessible to the community.

Transformed from an office building, the school includes 18 light-filled classrooms; collaborative learning spaces; media, arts and tech/robotics spaces on the first floor; and multi-purpose spaces for community meetings.

The school features systems that promote sustainability and resiliency, which include:

  • A reflective roof;
  • High R-value building envelope;
  • A storm water retention system;
  • High performance glazing that maximizes natural light;
  • LED lighting with daylight and motion sensors;
  • Low-flow plumbing fixtures; and
  • High-efficiency boilers.

The waterfront location connects students to their natural and historical environment, with access to views to the Boston Harbor and the Freedom Trail just a short walk away.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Case Study Highlights Texas District’s Campus Security Upgrades

    The Taft Independent School District near Corpus Christi, Texas, recently partnered with Intech Southwest Services to revamp its campus security technology system, according to a news release. Intech has released a case study on its website detailing the process that advanced the district’s technology by more than 20 years in less than three weeks.

  • woman looking at futuristic data display

    7 Technology Strategies for Future-Forward Facilities Management

    From college and university systems to K–12 districts, campus facilities and technology leaders must make strategic technology decisions that support both current needs and future possibilities.

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • Zurn Releases New Ductile Iron Frame Trench Drain System

    Zurn Elkay Water Solutions recently released the newest addition to its Train Drench portfolio, the Ductile Iron Frame Trench Drain System, according to a news release. The product is designed for heavy-duty applications like airports, military, universities, and more.