Construction Completed on El Capitan High School’s Events Center

Construction has been completed on the new $10.7 million, 15,000-square-foot event center for Grossmont Union High School District’s El Capitan High School in Lakeside, California. C.W. Driver Companies constructed the facility and HED served as the architect.  

Consisting of two buildings on the campus’ south side, the new event center houses band, drama, and dance spaces and features 250 retractable seats to accommodate theater productions, performances, and events. It also includes a lobby, concession and snack bar, storage space, AV room, and green room.

“It was a pleasure to partner with El Capitan High School to create a multifunctional events center that serves as a new focal point for the campus,” said Hank Withaar, vice president at C.W. Driver Companies. “We leveraged our extensive K-12 experience to build a facility that will serve students well and benefit the school’s performing arts programs for years to come.”

The new center’s design references the school’s outdoor surroundings including the lines and angles of the region’s mountains and horizons, and incorporated the region’s iconic sycamore trees into the landscaping.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at ymarquez@1105media.com.

Featured

  • Massachusetts Charter School Opens New Academic Building

    The Advanced Math and Science Academy Charter School (AMSA) in Marlborough, Mass., recently held a ribbon-cutting ceremony for a new academic building, according to a news release. The 17,000-square-foot space will serve as a classroom and science lab building for the student population of almost a thousand in grades 6–12.

  • Fort Collins to Convert 1980s Office Park into Junior High School

    The Liberty Common School, a charter-public school in Fort Collins, Colo., recently broke ground on an adaptive reuse project that will convert an 1980s-era office park into a 45,000-square-foot junior high school for seventh- and eighth-grade students, according to a news release.

  • Illinois Elementary School Breaks Ground on Campus Expansion

    Heather Hill Elementary School, part of Flossmoor School District 161 in Palatine, Ill., recently broke ground on a new addition to the school focused on student support and security, according to a news release. The district partnered with Wold Architects & Engineers for the expansion as part of a longer-term facility planning and modernization initiative.

  • College of the Desert Starts Construction on New Campus Location

    College of the Desert recently announced that it has broken ground on its new Palm Springs campus in Palm Springs, Calif., according to a news release. The multiple-building campus consists of 175,000 square feet of new construction and will cost an estimated $268 million.